|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: 5728 ft. Vertical TD: 5563 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/26/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2570 FSL 2007 FEL | | Bottom Hole Location: | Sec:35 Twp: 7S 96W | Footage: 2570 FSL 2007 FEL | | Proposed Depth/Form: | 6403 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 510-36 , Unit Acreage: 40, Drill Unit: NWSE | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-36 , Unit Acreage: 40, Drill Unit: NWSE | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 60 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6403 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: , Bottom: 6403 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/25/2009 | | Spud Date: | 10/29/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 5728 ft. | Measured PB depth: | 5621 ft. | | True Vertical TD: | 5563 ft. | True Vertical PB depth: | 5456 ft. | | Top PZ Location: | Sec:35 Twp: 7S 96W | Footage: 2564 FSL 1951 FEL | | Bottom Hole Location: | Sec:35 Twp: 7S 96W | Footage: 2553 FSL 2037 FEL | | Log Types: | CBL/RMTE | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1011 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 278, Top: 0 ft., Bottom: 1011 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5781 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 779, Top: 1568 ft., Bottom: 5781 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 2741 ft. | | | | | CAMEO | 5184 ft. | | | | | ROLLINS | 5571 ft. | | | |
Formation WFCM Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 4162 ft. Interval Bottom: 5513 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 5/3/2010 | Choke Size: | 0.500 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/24/2010 | | Treatment Summary: | FRAC 3,750 GAL OF 7.5% HCL; 334,488 GAL OF 2% KCL; 3,532 SKS OF OTTAWA PROPPANT; 604 SKS OF SB EXCEL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5326 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/4/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 150 | | BBLS_OIL | 0 | | BTU_GAS | 858 | | CALC_BBLS_H2O | 150 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 640 | | CASING_PRESS | 1080 | | MCF_GAS | 640 | | TUBING_PRESS | 760 |
| | Perforation Data: | | Interval Top: | 4162 ft. | # Of Holes: | 120 | | Interval Bottom: | 5513 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 55 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.027 |
| Average MCFE per Day | 0.150 |
| Federal Financial Assurance | i | Y |
|
|