Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15749
Well Classification: GW Status: PR - 9/24/2009
Well Name/No:BATTLEMENT MESA #26-24C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/24/2009
FacilityID:295404LocationID:334128
County:GARFIELD #045Location:SESW 26 7S95W 6
Field:PARACHUTE - #67350Elevation:8964 ft.
Basin:PICEANCE BASIN  
Planned Location:1272FSL  1947 FWLLat/Long: 39.404381 / -107.967158Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.404377 / -107.967160Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/24/2009             Measured TD: 10058 ft.    Vertical TD: 9969 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/24/2009
Wellbore PermitDIRECTIONAL
Permit #:20080898 Expiration Date:4/7/2009
Proposed Top PZ Location:Sec: Twp: Footage: 509 FSL  1929 FWL
Bottom Hole Location:Sec:26 Twp: 7S 95W Footage: 509 FSL  1929 FWL
Proposed Depth/Form:10687 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-53 , Unit Acreage: 640, Drill Unit: SEC26

Wellbore Completed
Completion Date:8/18/2008
Spud Date:7/30/2008Spud Date Is:ACTUAL
Measured TD:10058 ft.Measured PB depth:9985 ft.
True Vertical TD:9969 ft.True Vertical PB depth:9896 ft.
Top PZ Location:Sec:26 Twp: 7S 95WFootage: 543 FSL  1943 FWL
Bottom Hole Location:Sec:26 Twp: 7S 95WFootage: 543 FSL  1943 FWL
Log Types:CBL & RMT
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 3, Top: 0 ft., Bottom: 80 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3300 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1367, Top: 0 ft., Bottom: 3300 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10058 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 744, Top: 5950 ft., Bottom: 10058 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6992 ft.NN
CAMEO9361 ft.NN
ROLLINS9882 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/24/2009                 Interval Top: 8010 ft.    Interval Bottom: 9845 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/24/2009Choke Size:0.375 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/2009
Treatment Summary:FRAC 7,440 GAL OF 7.5% HCL; 628,521 GAL OF 2% KCL; 5,359 SKS OF OTTAWA PROPPANT; 1,441 SKS OF PRIME PLUS
Tubing Size:2.375 in.Tubing Setting Depth:9714 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/24/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 44
BBLS_OIL 0
BTU_GAS 928
CALC_BBLS_H2O 44
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 105
CASING_PRESS 375
MCF_GAS 105
TUBING_PRESS 0
Perforation Data:
Interval Top:8010 ft.# Of Holes:240
Interval Bottom:9845 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)18732
GOR814434
GOR DeterminationMCFE
Average BOE per Day8.908
Average MCFE per Day51.678

 Federal Financial Assurance  i Y

 Tribal Well  i No