Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15727
Well Classification: GW Status: PR - 4/1/2024
Well Name/No:LEVERICH #31-04B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2024
FacilityID:295309LocationID:334714
County:GARFIELD #045Location:SENW 31 6S93W 6
Field:RULISON - #75400Elevation:6664 ft.
Basin:PICEANCE BASIN  
Planned Location:2427FNL  1558 FWLLat/Long: 39.482933 / -107.821226Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.482970 / -107.821230Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2024             Measured TD: 9570 ft.    Vertical TD: 9206 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20080776 Expiration Date:4/2/2009
Proposed Top PZ Location:Sec: Twp: Footage: 493 FNL  671 FWL
Bottom Hole Location:Sec:31 Twp: 6S 93W Footage: 493 FNL  671 FWL
Proposed Depth/Form:9568 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: 139-47 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:7/25/2008
Spud Date:5/27/2008Spud Date Is:ACTUAL
Measured TD:9570 ft.Measured PB depth:9529 ft.
True Vertical TD:9206 ft.True Vertical PB depth:9165 ft.
Top PZ Location:Sec:31 Twp: 6S 93WFootage: 487 FNL  673 FWL
Bottom Hole Location:Sec:31 Twp: 6S 93WFootage: 487 FNL  673 FWL
Log Types:SD/DSN/HRI, TEMP, CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1509 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1509 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9560 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 2458 ft., Bottom: 9560 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5614 ft.NN
ROLLINS9406 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2024                  Interval Top: 7312 ft.    Interval Bottom: 9390 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/21/2008Choke Size:0.281 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/2008
Treatment Summary:1,556,031 GALS. SLICKWATER; 782,900 # 20/40 WHITE SAND; 5,000 GALS. 15% HCL ACID.
Tubing Size:2.375 in.Tubing Setting Depth:8860 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/6/2008Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 155
BTU_GAS 1100
CALC_BBLS_H2O 155
CALC_MCF_GAS 1129
CASING_PRESS 750
MCF_GAS 1129
Perforation Data:
Interval Top:7312 ft.# Of Holes:195
Interval Bottom:9390 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)115
Total Gas Produced (MCF)25578
GOR222417
GOR DeterminationMCFE
Average BOE per Day12.396
Average MCFE per Day71.895

 Federal Financial Assurance  i 

 Tribal Well  i No