Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15716
Well Classification: GW Status: PR - 10/31/2008
Well Name/No:FEDERAL #PA 312-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC-62162
Facility Status:PRStatus Date10/31/2008
FacilityID:295267LocationID:335124
County:GARFIELD #045Location:SWNW 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5273 ft.
Basin:PICEANCE BASIN  
Planned Location:1341FNL  1288 FWLLat/Long: 39.484501 / -108.026532Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.484499 / -108.026534Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/31/2008             Measured TD: 7010 ft.    Vertical TD: 6845 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20080693 Expiration Date:3/30/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1584 FNL  182 FWL
Bottom Hole Location:Sec:32 Twp: 67S 95W Footage: 1584 FNL  182 FWL
Proposed Depth/Form:6986 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:6/11/2008
Spud Date:5/30/2008Spud Date Is:ACTUAL
Measured TD:7010 ft.Measured PB depth:6944 ft.
True Vertical TD:6845 ft.True Vertical PB depth:6779 ft.
Top PZ Location:Sec:32 Twp: 6S 95WFootage: 1599 FNL  193 FWL
Bottom Hole Location:Sec:32 Twp: 6S 95WFootage: 1599 FNL  193 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1860 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 491, Top: 0 ft., Bottom: 1860 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6991 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1060, Top: 2370 ft., Bottom: 6991 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1556 ft.NN
FORT UNION1773 ft.NN
MESAVERDE3613 ft.NN
CAMEO6219 ft.NN
ROLLINS6817 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/31/2008                Interval Top: 4940 ft.    Interval Bottom: 6716 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/9/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2008
Treatment Summary:3500 GALS 7 1/2% HCL; 736700 20/40 SAND; 20825 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6145 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1170
CALC_GOR 0
CALC_MCF_GAS 1615
CASING_PRESS 1563
MCF_GAS 1615
TUBING_PRESS 1411
Perforation Data:
Interval Top:4940 ft.# Of Holes:147
Interval Bottom:6716 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)16871
GOR624851
GOR DeterminationMCFE
Average BOE per Day8.049
Average MCFE per Day46.653

 Federal Financial Assurance  i Y

 Tribal Well  i No