Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15714
Well Classification: GW Status: PR - 3/31/2008
Well Name/No:FEDERAL #PA 411-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC-62162
Facility Status:PRStatus Date3/31/2008
FacilityID:295265LocationID:335124
County:GARFIELD #045Location:SWNW 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5273 ft.
Basin:PICEANCE BASIN  
Planned Location:1339FNL  1296 FWLLat/Long: 39.484505 / -108.026506Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.484504 / -108.026508Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/30/2008             Measured TD: 6825 ft.    Vertical TD: 6717 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20080694 Expiration Date:3/30/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1290 FNL  333 FWL
Bottom Hole Location:Sec:32 Twp: 67S 95W Footage: 1290 FNL  333 FWL
Proposed Depth/Form:6925 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:6/23/2008
Spud Date:6/12/2008Spud Date Is:ACTUAL
Measured TD:6825 ft.Measured PB depth:6800 ft.
True Vertical TD:6717 ft.True Vertical PB depth:6692 ft.
Top PZ Location:Sec:32 Twp: 6S 95WFootage: 1306 FNL  353 FWL
Bottom Hole Location:Sec:32 Twp: 6S 95WFootage: 1306 FNL  353 FWL
Log Types:CBL, HIGH RES.IND.,SPECTRAL DENSITY,DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1805 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 1805 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6824 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1060, Top: 2070 ft., Bottom: 6824 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE3582 ft.NN
CAMEO6173 ft.NN
ROLLINS6780 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/25/2008                Interval Top: 4650 ft.    Interval Bottom: 6672 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/9/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2008
Treatment Summary:4000 GALS 7.5% HCL; 1,044,100# 20/40 SAND; 28,649 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5948 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/25/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CASING_PRESS 1109
MCF_GAS 1133
TUBING_PRESS 914
Perforation Data:
Interval Top:4650 ft.# Of Holes:164
Interval Bottom:6672 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)30
Total Gas Produced (MCF)17082
GOR569400
GOR DeterminationMCFE
Average BOE per Day8.155
Average MCFE per Day47.299

 Federal Financial Assurance  i Y

 Tribal Well  i No