Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15713
Well Classification: GW Status: PR - 10/31/2008
Well Name/No:FEDERAL #PA 511-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC-62162
Facility Status:PRStatus Date10/31/2008
FacilityID:295264LocationID:335124
County:GARFIELD #045Location:SENW 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5273 ft.
Basin:PICEANCE BASIN  
Planned Location:1335FNL  1318 FWLLat/Long: 39.484519 / -108.026428Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.484518 / -108.026432Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/31/2008             Measured TD: 6807 ft.    Vertical TD: 6700 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20080695 Expiration Date:3/30/2009
Proposed Top PZ Location:Sec: Twp: Footage: 949 FNL  502 FWL
Bottom Hole Location:Sec:32 Twp: 67S 95W Footage: 949 FNL  502 FWL
Proposed Depth/Form:6924 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:7/17/2008
Spud Date:7/6/2008Spud Date Is:ACTUAL
Measured TD:6807 ft.Measured PB depth:6754 ft.
True Vertical TD:6700 ft.True Vertical PB depth:6647 ft.
Top PZ Location:Sec:32 Twp: 6S 95WFootage: 973 FNL  522 FWL
Bottom Hole Location:Sec:32 Twp: 6S 95WFootage: 973 FNL  522 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1792 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 303, Top: 0 ft., Bottom: 1792 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6781 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1024, Top: 2722 ft., Bottom: 6781 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1556 ft.NN
MESAVERDE3587 ft.NN
CAMEO6182 ft.NN
ROLLINS6806 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/31/2008                Interval Top: 4844 ft.    Interval Bottom: 6618 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/9/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2008
Treatment Summary:3000 GALS 7 1/2% HCL; 753400 20/40 SAND; 23121 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6292 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_GOR 0
CALC_MCF_GAS 1680
CASING_PRESS 1502
MCF_GAS 1680
TUBING_PRESS 1359
Perforation Data:
Interval Top:4844 ft.# Of Holes:119
Interval Bottom:6618 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)17884
GOR662370
GOR DeterminationMCFE
Average BOE per Day8.521
Average MCFE per Day49.434

 Federal Financial Assurance  i Y

 Tribal Well  i No