Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15703
Well Classification: GW Status: PR - 3/1/2023
Well Name/No:CHEVRON #31-6D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2023
FacilityID:295220LocationID:335964
County:GARFIELD #045Location:NESE 31 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8404 ft.
Basin:PICEANCE BASIN  
Planned Location:1521FSL  637 FELLat/Long: 39.568551 / -108.204435Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.568455 / -108.204587Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2023             Measured TD: 9735 ft.    Vertical TD: 9702 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/10/2011
Proposed Top PZ Location:Sec:31 Twp: 5S 96W Footage: 1814 FSL  819 FEL
Bottom Hole Location:Sec:31 Twp: 5S 96W Footage: 1809 FSL  863 FEL
Proposed Depth/Form:9619 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: , Depth: 90 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: , Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9619 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1200, Top: 6500 ft., Bottom: 9619 ft.
Casing:String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9619 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 200 ft., Bottom: 9619 ft.

Wellbore Completed
Completion Date:6/9/2010
Spud Date:5/30/2010Spud Date Is:ACTUAL
Measured TD:9735 ft.Measured PB depth:9662 ft.
True Vertical TD:9702 ft.True Vertical PB depth:9629 ft.
Top PZ Location:Sec:31 Twp: 5S 96WFootage: 1814 FSL  819 FEL
Bottom Hole Location:Sec:31 Twp: 5S 96WFootage: 1809 FSL  863 FEL
Log Types:RST PACKAGE, MUD LOG
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 123 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 123 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2310 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1194, Top: 0 ft., Bottom: 2310 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9712 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 554, Top: 2900 ft., Bottom: 9712 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK6477 ft.
WILLIAMS FORK6743 ft.
CAMEO9324 ft.
ROLLINS9565 ft.

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 3/1/2023                  Interval Top: 7574 ft.    Interval Bottom: 9137 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:7/29/2010Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/15/2010
Treatment Summary:WELL FRAC'D IN 7 STAGES USING 50,757 BBLS SLICK WATER AND 1,063,962 LBS OF 30-50 WHITE SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8885 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/29/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 714
BTU_GAS 1077
CALC_BBLS_H2O 714
CALC_MCF_GAS 1067
CASING_PRESS 1320
MCF_GAS 1067
Perforation Data:
Interval Top:7574 ft.# Of Holes:206
Interval Bottom:9137 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)69
Total Gas Produced (MCF)26968
GOR390840
GOR DeterminationMCFE
Average BOE per Day13.544
Average MCFE per Day78.538

 Federal Financial Assurance  i 

 Tribal Well  i No