Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15631
Well Classification: GW Status: PR - 10/26/2008
Well Name/No:N. PARACHUTE #WF07A-36 A36 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/26/2008
FacilityID:294902LocationID:335848
County:GARFIELD #045Location:NENE 36 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5797 ft.
Planned Location:198FNL  557 FELLat/Long: 39.578364 / -108.110597Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.578364 / -108.110597Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/26/2008             Measured TD: 9055 ft.    Vertical TD: 8646 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/26/2008
Wellbore PermitDIRECTIONAL
Permit #:20080238 Expiration Date:3/9/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1448 FNL  1957 FEL
Bottom Hole Location:Sec:36 Twp: 5S 96W Footage: 1448 FNL  1957 FEL
Proposed Depth/Form:11908 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/11/2008
Spud Date:4/1/2008Spud Date Is:ACTUAL
Measured TD:9055 ft.Measured PB depth:8996 ft.
True Vertical TD:8646 ft.True Vertical PB depth:8587 ft.
Top PZ Location:Sec:36 Twp: 5S 96WFootage: 1413 FNL  1915 FEL
Bottom Hole Location:Sec:36 Twp: 5S 96WFootage: 1413 FNL  1915 FEL
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2118 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 519, Top: 0 ft., Bottom: 2118 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9042 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1236, Top: 2370 ft., Bottom: 9043 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5355 ft.8950 ft.NN
ROLLINS8950 ft.9055 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/26/2008                Interval Top: 5424 ft.    Interval Bottom: 8863 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/21/2008Choke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/18/2008
Treatment Summary:STAGES 1-12 TREATED WITH A TOTAL OF 50812 BBLS OF SLICKWATER, 542000 LBS 30/50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7606 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 50
BTU_GAS 1170
CALC_BBLS_H2O 50
CALC_MCF_GAS 1063
CASING_PRESS 1875
MCF_GAS 1063
TUBING_PRESS 1250
Perforation Data:
Interval Top:5424 ft.# Of Holes:360
Interval Bottom:8863 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)100
Total Gas Produced (MCF)17327
GOR173270
GOR DeterminationMCFE
Average BOE per Day8.463
Average MCFE per Day49.064

 Federal Financial Assurance  i 

 Tribal Well  i No