Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15630
Well Classification: GW Status: PR - 10/13/2008
Well Name/No:N. PARACHUTE #WF07C-36 A36 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/13/2008
FacilityID:294901LocationID:335848
County:GARFIELD #045Location:NENE 36 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5797 ft.
Planned Location:206FNL  557 FELLat/Long: 39.578342 / -108.110597Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.578342 / -108.110597Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/13/2008             Measured TD: 9240 ft.    Vertical TD: 8608 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/13/2008
Wellbore PermitDIRECTIONAL
Permit #:20080237 Expiration Date:3/9/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2026 FNL  1926 FEL
Bottom Hole Location:Sec:36 Twp: 5S 96W Footage: 2026 FNL  1926 FEL
Proposed Depth/Form:12113 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/18/2008
Spud Date:3/29/2008Spud Date Is:ACTUAL
Measured TD:9240 ft.Measured PB depth:9202 ft.
True Vertical TD:8608 ft.True Vertical PB depth:8570 ft.
Top PZ Location:Sec:36 Twp: 5S 96WFootage: 2056 FNL  1938 FEL
Bottom Hole Location:Sec:36 Twp: 5S 96WFootage: 2056 FNL  1938 FEL
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 125 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 125 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.875 in., Top: 0 ft., Depth: 2225 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 499, Top: 0 ft., Bottom: 2225 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9226 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1257, Top: 1830 ft., Bottom: 9229 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5559 ft.9143 ft.NN
ROLLINS9143 ft.9240 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/13/2008                Interval Top: 5622 ft.    Interval Bottom: 9063 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/7/2008Choke Size:0.250 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/18/2008
Treatment Summary:STAGES 1-11 TREATED WITH A TOTAL OF 53215 BBLS OF SLICKWATER, 120000 LBS 30/50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7916 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_GOR 0
CALC_MCF_GAS 1021
CASING_PRESS 2150
MCF_GAS 1020
TUBING_PRESS 1525
Perforation Data:
Interval Top:5622 ft.# Of Holes:330
Interval Bottom:9063 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)92
Total Gas Produced (MCF)15773
GOR171445
GOR DeterminationMCFE
Average BOE per Day7.707
Average MCFE per Day44.707

 Federal Financial Assurance  i 

 Tribal Well  i No