Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15629
Well Classification: GW Status: PR - 11/2/2008
Well Name/No:N. PARACHUTE #WF15A-25 A36 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/2/2008
FacilityID:294900LocationID:335848
County:GARFIELD #045Location:NENE 36 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5797 ft.
Basin:PICEANCE BASIN  
Planned Location:150FNL  567 FELLat/Long: 39.578494 / -108.110631Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.578494 / -108.110631Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/2/2008             Measured TD: 9208 ft.    Vertical TD: 8790 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/2/2008
Wellbore PermitDIRECTIONAL
Permit #:20080236 Expiration Date:3/9/2009
Proposed Top PZ Location:Sec:25 Twp: 5S 96W Footage: 1157 FSL  1953 FEL
Bottom Hole Location:Sec:25 Twp: 5S 96W Footage: 1157 FSL  1953 FEL
Proposed Depth/Form:11923 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/27/2008
Spud Date:4/18/2008Spud Date Is:ACTUAL
Measured TD:9208 ft.Measured PB depth:9153 ft.
True Vertical TD:8790 ft.True Vertical PB depth:8735 ft.
Top PZ Location:Sec:25 Twp: 5S 96WFootage: 1157 FSL  1953 FEL
Bottom Hole Location:Sec:25 Twp: 5S 96WFootage: 1157 FSL  1953 FEL
Log Types:MUD AND CBL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 115 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 0 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.875 in., Top: 0 ft., Depth: 2229 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 501, Top: 0 ft., Bottom: 2230 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9188 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1270, Top: 2680 ft., Bottom: 9188 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5471 ft.9096 ft.NN
ROLLINS9096 ft.9208 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 11/2/2008                 Interval Top: 5516 ft.    Interval Bottom: 9017 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/14/2008Choke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/18/2008
Treatment Summary:STAGES 1-11 TREATED WITH A TOTAL OF 55,235 BBLS. SLICKWATER; 110,000 LBS. 30-50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7603 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/2/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_MCF_GAS 1072
CASING_PRESS 1600
MCF_GAS 1072
TUBING_PRESS 1000
Perforation Data:
Interval Top:5516 ft.# Of Holes:330
Interval Bottom:9017 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)85
Total Gas Produced (MCF)15806
GOR185952
GOR DeterminationMCFE
Average BOE per Day7.701
Average MCFE per Day44.672

 Federal Financial Assurance  i 

 Tribal Well  i No