Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15589
Well Classification: GW Status: PR - 8/10/2012
Well Name/No:GENTRY #B14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/10/2012
FacilityID:294762LocationID:335549
County:GARFIELD #045Location:SENW 17 6S92W 6
Field:MAMM CREEK - #52500Elevation:5625 ft.
Basin:PICEANCE BASIN  
Planned Location:2001FNL  1631 FWLLat/Long: 39.528384 / -107.694202Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.528383 / -107.694203Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/6/2012
End Date: 6/6/2012
Reported: 7/16/2012
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/10/2012             Measured TD: 7937 ft.    Vertical TD: 7883 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/10/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/9/2014
Proposed Top PZ Location:Sec:17 Twp: 6S 92W Footage: 1855 FNL  1094 FWL
Bottom Hole Location:Sec:17 Twp: 6S 92W Footage: 1855 FNL  1094 FWL
Proposed Depth/Form:7945 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: 191-25 , Unit Acreage: 320, Drill Unit: N/2, S/2
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 191-24 , Unit Acreage: 320, Drill Unit: N/2, S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 55# , Citings Type: PLANNED
Cement:Sacks: 177, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 24/32# , Citings Type: PLANNED
Cement:Sacks: 439, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7945 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 1311, Top: , Bottom: 7945 ft.
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 9103 ft., Weight: 17# , Citings Type: PLANNED
Cement:Sacks: 784, Top: 4753 ft., Bottom: 9103 ft.

Wellbore Completed
Completion Date:4/15/2012
Spud Date:3/1/2012Spud Date Is:ACTUAL
Measured TD:7937 ft.Measured PB depth:7878 ft.
True Vertical TD:7883 ft.True Vertical PB depth:7824 ft.
Top PZ Location:Sec:17 Twp: 6S 92WFootage: 1847 FNL  1093 FWL
Bottom Hole Location:Sec:17 Twp: 6S 92WFootage: 1846 FNL  1095 FWL
Log Types:Mud, Temp, CBL
Log Types:CBL, Temp Log, Mud Log
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 84 ft., Weight: 55# , Citings Type: ACTUAL
Cement:Sacks: 177, Top: 0 ft., Bottom: 84 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1077 ft., Weight: 32# , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1094 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7927 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 2410 ft., Bottom: 7937 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4028 ft.
ROLLINS7740 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/23/2012                 Interval Top: 6070 ft.    Interval Bottom: 7698 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/10/2012Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/29/2012
Treatment Summary:WFCM - Frac'd with 89,047 bbls 2% KCL Slickwater, 1,084,300 lbs 30/50 sand, 1,061,900 lbs 20/40 sand and 221,200 lbs 20/40 SLC sand.
Tubing Size:2.375 in.Tubing Setting Depth:6352 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/20/2012Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 684
BTU_GAS 1243
CALC_BBLS_H2O 684
CALC_MCF_GAS 2089
CASING_PRESS 900
MCF_GAS 2089
TUBING_PRESS 1575
Perforation Data:
Interval Top:6070 ft.# Of Holes:208
Interval Bottom:7698 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)308
Total Gas Produced (MCF)24251
GOR78737
GOR DeterminationMCFE
Average BOE per Day12.298
Average MCFE per Day71.326

 Federal Financial Assurance  i 

 Tribal Well  i No