Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15515
Well Classification: GW Status: PR - 2/15/2008
Well Name/No:WEBSTER HILL, LLC #RWF 314-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC57575
Facility Status:PRStatus Date2/15/2008
FacilityID:294540LocationID:335269
County:GARFIELD #045Location:SWSW 27 6S94W 6
Field:RULISON - #75400Elevation:5322 ft.
Basin:PICEANCE BASIN  
Planned Location:579FSL  598 FWLLat/Long: 39.490606 / -107.881365Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.490607 / -107.881366Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/10/2007             Measured TD: 7660 ft.    Vertical TD: 7604 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/10/2007
Wellbore PermitDIRECTIONAL
Permit #:20077033 Expiration Date:2/14/2009
Proposed Top PZ Location:Sec: Twp: Footage: 922 FSL  1206 FWL
Bottom Hole Location:Sec:27 Twp: 6S 94W Footage: 922 FSL  1206 FWL
Proposed Depth/Form:7665 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:4/17/2008
Spud Date:4/4/2008Spud Date Is:ACTUAL
Measured TD:7660 ft.Measured PB depth:7600 ft.
True Vertical TD:7604 ft.True Vertical PB depth:7544 ft.
Top PZ Location:Sec:27 Twp: 6S 94WFootage: 929 FSL  1202 FWL
Bottom Hole Location:Sec:27 Twp: 6S 94WFootage: 929 FSL  1202 FWL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1145 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 0 ft., Bottom: 1145 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7627 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1274, Top: 3010 ft., Bottom: 7627 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1473 ft.NN
MESAVERDE3905 ft.NN
CAMEO6660 ft.NN
ROLLINS7550 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2008                 Interval Top: 5609 ft.    Interval Bottom: 7472 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/23/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/20/2008
Treatment Summary:3000 GALS 7.5% HCL; 688,885#20/40 SAND; 16,754 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6836 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 1597
MCF_GAS 974
TUBING_PRESS 1444
Perforation Data:
Interval Top:5609 ft.# Of Holes:128
Interval Bottom:7472 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)17226
GOR538312
GOR DeterminationMCFE
Average BOE per Day8.223
Average MCFE per Day47.709

 Federal Financial Assurance  i 

 Tribal Well  i No