|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/20/2010 Measured TD: 12465 ft. Vertical TD: 8136 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/20/2010 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20088342 | Expiration Date: | 2/18/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1593 FNL 2025 FWL | | Bottom Hole Location: | Sec:20 Twp: 5S 95W | Footage: 1593 FNL 2025 FWL | | Proposed Depth/Form: | 13376 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 90 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3600 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 2082, Top: 0 ft., Bottom: 3600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 13376 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1110, Top: , Bottom: 13376 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/16/2009 | | Spud Date: | 8/13/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 12465 ft. | Measured PB depth: | 12336 ft. | | True Vertical TD: | 8136 ft. | True Vertical PB depth: | 8007 ft. | | Top PZ Location: | Sec:29 Twp: 5S 95W | Footage: 360 FNL 2234 FWL | | Bottom Hole Location: | Sec:20 Twp: 5S 95W | Footage: 1195 FNL 2494 FWL | | Log Types: | CBL, RST, MUD, TRIPLE COMBO GAMMA RAY | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 200 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 200 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 2205 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 959, Top: 0 ft., Bottom: 2205 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 7538 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 967, Top: 0 ft., Bottom: 7538 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 12445 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 617, Top: 4760 ft., Bottom: 12445 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 6729 ft. | 12465 ft. | | |
Formation WMFK Formation Classification: GW Status: PR - 1/20/2010 Interval Top: 8378 ft. Interval Bottom: 12293 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 1/13/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/27/2009 | | Treatment Summary: | STAGES 1-18 TREATED WITH A TOTAL OF: 248,062 BBLS OF SLICKWATER, 64,800 LBS 100 SAND, 219,500 LBS 20-40 SAND, 963,500 LBS 40-70 SAND, 223,392 SCF N2, 580 BBL 15% HCI, ABRASIVE JET PERF (3 STAGES) WITH 30,000 LBS 100 MESH AND 668 BBL WATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7456 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1195 | | CASING_PRESS | 2383 | | MCF_GAS | 2518 | | TUBING_PRESS | 1203 |
| | Perforation Data: | | Interval Top: | 8378 ft. | # Of Holes: | 1302 | | Interval Bottom: | 12293 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 220 |
| Total Gas Produced (MCF) | 40912 |
| GOR | 185963 |
| GOR Determination | MCFE |
| Average BOE per Day | 19.924 |
| Average MCFE per Day | 115.559 |
| Federal Financial Assurance | i | |
|
|