Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15485
Well Classification: GW Status: PR - 3/10/2010
Well Name/No:PRATHER/LATHAM #3-21A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/10/2010
FacilityID:313LocationID:334183
County:GARFIELD #045Location:NWNE 3 8S96W 6
Field:GRAND VALLEY - #31290Elevation:5283 ft.
Basin:PICEANCE BASIN  
Planned Location:1179FNL  1557 FELLat/Long: 39.383081 / -108.091794Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.383082 / -108.091823Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/10/2010             Measured TD: 5867 ft.    Vertical TD: 5280 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/10/2010
Wellbore PermitDIRECTIONAL
Permit #:20090393 Expiration Date:7/9/2010
Proposed Top PZ Location:Sec: Twp: Footage: 177 FNL  1992 FWL
Bottom Hole Location:Sec:3 Twp: 8S 96W Footage: 177 FNL  1992 FWL
Proposed Depth/Form:6300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-82 , Unit Acreage: 41, Drill Unit: NENW
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-82 , Unit Acreage: 41, Drill Unit: NENW
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 60 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 5, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6300 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 200 ft., Bottom: 6300 ft.

Wellbore Completed
Completion Date:12/24/2009
Spud Date:12/17/2009Spud Date Is:ACTUAL
Measured TD:5867 ft.Measured PB depth:5795 ft.
True Vertical TD:5280 ft.True Vertical PB depth:5208 ft.
Top PZ Location:Sec:3 Twp: 8S 96WFootage: 130 FNL  2082 FWL
Bottom Hole Location:Sec:3 Twp: 8S 96WFootage: 152 FNL  2058 FWL
Log Types:CBL/RMTE
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 104 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1197 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 419, Top: 0 ft., Bottom: 1197 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5855 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 2146 ft., Bottom: 5855 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK2847 ft.NN
CAMEO5251 ft.NN
ROLLINS5651 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/10/2010                 Interval Top: 4295 ft.    Interval Bottom: 5506 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/9/2010Choke Size:0.375 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/1/2010
Treatment Summary:FRAC 3,750 GAL OF 7.5% HCL; 353,178 GAL OF 2% KCL; 3,500 SKS OF OTTAWA PROPPANT; 940 SKS OF SB EXCEL
Tubing Size:2.375 in.Tubing Setting Depth:5237 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 0
BTU_GAS 1092
CALC_BBLS_H2O 102
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 913
CASING_PRESS 950
MCF_GAS 913
TUBING_PRESS 770
Perforation Data:
Interval Top:4295 ft.# Of Holes:121
Interval Bottom:5506 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12251
GOR
GOR DeterminationMCFE
Average BOE per Day5.782
Average MCFE per Day33.556

 Federal Financial Assurance  i 

 Tribal Well  i No