Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15478
Well Classification: GW Status: PR - 3/2/2010
Well Name/No:PRATHER/LATHAM #3-31A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/2/2010
FacilityID:306LocationID:334183
County:GARFIELD #045Location:NWNE 3 8S96W 6
Field:GRAND VALLEY - #31290Elevation:5283 ft.
Basin:PICEANCE BASIN  
Planned Location:1179FNL  1527 FELLat/Long: 39.383082 / -108.091688Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.383083 / -108.091690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/2/2010             Measured TD: 5442 ft.    Vertical TD: 5203 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/2/2010
Wellbore PermitDIRECTIONAL
Permit #:20090398 Expiration Date:7/9/2010
Proposed Top PZ Location:Sec: Twp: Footage: 151 FNL  1986 FEL
Bottom Hole Location:Sec:3 Twp: 8S 96W Footage: 151 FNL  1986 FEL
Proposed Depth/Form:6300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: 41, Drill Unit: NWNE
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 41, Drill Unit: NWNE
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 60 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 5, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6300 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 200 ft., Bottom: 6300 ft.

Wellbore Completed
Completion Date:12/11/2009
Spud Date:12/7/2009Spud Date Is:ACTUAL
Measured TD:5442 ft.Measured PB depth:5389 ft.
True Vertical TD:5203 ft.True Vertical PB depth:5150 ft.
Top PZ Location:Sec:3 Twp: 8S 96WFootage: 134 FNL  1911 FEL
Bottom Hole Location:Sec:3 Twp: 8S 96WFootage: 129 FNL  1948 FEL
Log Types:CBL/RMTE
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 104 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1504 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 419, Top: 0 ft., Bottom: 1503 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5432 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 2330 ft., Bottom: 5432 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK2528 ft.NN
CAMEO4879 ft.NN
ROLLINS5304 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/2/2010                  Interval Top: 3908 ft.    Interval Bottom: 5172 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/1/2010Choke Size:0.375 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/18/2010
Treatment Summary:FRAC 4,500 GAL OF 7.5% HCL; 272,496 GAL OF 2% KCL; 4,085 SKS OF OTTAWA PROPPANT; 1,030 SKS OF SB EXCEL
Tubing Size:2.375 in.Tubing Setting Depth:4885 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/2/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 96
BBLS_OIL 0
BTU_GAS 1070
CALC_BBLS_H2O 96
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1020
CASING_PRESS 1020
MCF_GAS 1020
TUBING_PRESS 900
Perforation Data:
Interval Top:3908 ft.# Of Holes:138
Interval Bottom:5172 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6962
GOR
GOR DeterminationMCFE
Average BOE per Day3.285
Average MCFE per Day19.074

 Federal Financial Assurance  i 

 Tribal Well  i No