Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15461
Well Classification: GW Status: PR - 12/1/2018
Well Name/No:N. PARACHUTE #MF01A C28 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2018
FacilityID:253LocationID:335200
County:GARFIELD #045Location:NENW 28 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5682 ft.
Basin:PICEANCE BASIN  
Planned Location:498FNL  1642 FWLLat/Long: 39.501106 / -108.117392Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.501106 / -108.117389Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2018             Measured TD: 8065 ft.    Vertical TD: 7068 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20076691 Expiration Date:1/31/2009
Proposed Top PZ Location:Sec: Twp: Footage: 110 FNL  943 FEL
Bottom Hole Location:Sec:28 Twp: 6S 96W Footage: 110 FNL  943 FEL
Proposed Depth/Form:12112 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/4/2008
Spud Date:7/5/2008Spud Date Is:ACTUAL
Measured TD:8065 ft.Measured PB depth:8022 ft.
True Vertical TD:7068 ft.True Vertical PB depth:7025 ft.
Top PZ Location:Sec:28 Twp: 6S 96WFootage: 17 FNL  1118 FEL
Bottom Hole Location:Sec:28 Twp: 6S 96WFootage: 17 FNL  1118 FEL
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1845 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 1845 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8046 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1355, Top: 2380 ft., Bottom: 8046 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4799 ft.7982 ft.NN
ROLLINS7982 ft.8065 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/1/2018                 Interval Top: 4926 ft.    Interval Bottom: 7909 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/24/2009Choke Size:0.500 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/22/2009
Treatment Summary:STAGES 01-09 TREATED WITH A TOTAL OF: 51276 BBLS OF SLICKWATER, 368000 LBS 20-40 SAND, 139000 LBS 30-50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6736 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/17/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_GOR 0
CALC_MCF_GAS 2324
CASING_PRESS 1260
MCF_GAS 2324
TUBING_PRESS 810
Perforation Data:
Interval Top:4926 ft.# Of Holes:270
Interval Bottom:7909 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)146
Total Gas Produced (MCF)25835
GOR176952
GOR DeterminationMCFE
Average BOE per Day12.622
Average MCFE per Day73.210

 Federal Financial Assurance  i 

 Tribal Well  i No