Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15446
Well Classification: GW Status: PR - 9/30/2008
Well Name/No:WILLIAMS #RWF 441-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC53847
Facility Status:PRStatus Date9/30/2008
FacilityID:139LocationID:311599
County:GARFIELD #045Location:SENE 33 6S94W 6
Field:RULISON - #75400Elevation:5325 ft.
Basin:PICEANCE BASIN  
Planned Location:1454FNL  1061 FELLat/Long: 39.485052 / -107.887314Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485052 / -107.887314Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/30/2008             Measured TD: 7502 ft.    Vertical TD: 7437 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20076730 Expiration Date:1/29/2009
Proposed Top PZ Location:Sec: Twp: Footage: 856 FNL  606 FEL
Bottom Hole Location:Sec:33 Twp: 6S 94W Footage: 856 FNL  606 FEL
Proposed Depth/Form:7481 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:5/24/2008
Spud Date:5/10/2008Spud Date Is:ACTUAL
Measured TD:7502 ft.Measured PB depth:7452 ft.
True Vertical TD:7437 ft.True Vertical PB depth:7388 ft.
Top PZ Location:Sec:33 Twp: 6S 94WFootage: 842 FNL  581 FEL
Bottom Hole Location:Sec:33 Twp: 6S 94WFootage: 842 FNL  581 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1128 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7482 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1012, Top: 2350 ft., Bottom: 7482 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1504 ft.NN
MESAVERDE3911 ft.NN
CAMEO6617 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/30/2008                 Interval Top: 5377 ft.    Interval Bottom: 7358 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/22/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/17/2008
Treatment Summary:3559 GALS 7 1/2% HCL; 744100# 20/40 SAND; 23519 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6960 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_MCF_GAS 1106
CASING_PRESS 1228
MCF_GAS 1106
TUBING_PRESS 1048
Perforation Data:
Interval Top:5377 ft.# Of Holes:131
Interval Bottom:7358 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)40
Total Gas Produced (MCF)23044
GOR576100
GOR DeterminationMCFE
Average BOE per Day10.995
Average MCFE per Day63.782

 Federal Financial Assurance  i 

 Tribal Well  i No