Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15442
Well Classification: GW Status: PR - 8/21/2008
Well Name/No:SAVAGE #PA 534-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC51015
Facility Status:PRStatus Date8/21/2008
FacilityID:122LocationID:334654
County:GARFIELD #045Location:SWSE 4 7S95W 6
Field:PARACHUTE - #67350Elevation:5756 ft.
Basin:PICEANCE BASIN  
Planned Location:110FSL  2029 FELLat/Long: 39.459638 / -108.000640Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.459636 / -108.000643Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/21/2008             Measured TD: 7095 ft.    Vertical TD: 7083 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/21/2008
Wellbore PermitDIRECTIONAL
Permit #:200767128 Expiration Date:1/28/2009
Proposed Top PZ Location:Sec: Twp: Footage: 400 FSL  1997 FEL
Bottom Hole Location:Sec:4 Twp: 7S 95W Footage: 400 FSL  1997 FEL
Proposed Depth/Form:7078 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 640, Drill Unit:

Wellbore Completed
Completion Date:4/30/2008
Spud Date:4/15/2008Spud Date Is:ACTUAL
Measured TD:7095 ft.Measured PB depth:7018 ft.
True Vertical TD:7083 ft.True Vertical PB depth:7006 ft.
Top PZ Location:Sec:4 Twp: 7S 95WFootage: 416 FSL  1996 FEL
Bottom Hole Location:Sec:4 Twp: 7S 95WFootage: 416 FSL  1996 FEL
Log Types:MUD, CBL, SPEC-DENS/DUAL-SP-NEUTRON/HI-RES INDUCTION
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1953 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 529, Top: 0 ft., Bottom: 1953 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7075 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 991, Top: 5130 ft., Bottom: 7075 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1807 ft.NN
MESAVERDE3881 ft.NN
CAMEO5979 ft.NN
ROLLINS6919 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/21/2008                 Interval Top: 5210 ft.    Interval Bottom: 6819 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/23/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/20/2008
Treatment Summary:2528 GALS 7 1/2% HCL; 595229 WHITE 20 SAND; 14129 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6229 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/21/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1074
CALC_GOR 0
CASING_PRESS 664
MCF_GAS 1004
TUBING_PRESS 543
Perforation Data:
Interval Top:5210 ft.# Of Holes:99
Interval Bottom:6819 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7626
GOR693272
GOR DeterminationMCFE
Average BOE per Day3.639
Average MCFE per Day21.076

 Federal Financial Assurance  i 

 Tribal Well  i No