Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15433
Well Classification: GW Status: PR - 4/17/2008
Well Name/No:SCOTT #34A-25-692
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/17/2008
FacilityID:54LocationID:335079
County:GARFIELD #045Location:SWSE 25 6S92W 6
Field:MAMM CREEK - #52500Elevation:5827 ft.
Basin:PICEANCE BASIN  
Planned Location:315FSL  2365 FELLat/Long: 39.492010 / -107.614280Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.492020 / -107.614280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/17/2008             Measured TD: 7100 ft.    Vertical TD: 7068 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/17/2008
Wellbore PermitDIRECTIONAL
Permit #:20080033 Expiration Date:1/24/2009
Proposed Top PZ Location:Sec: Twp: Footage: 110 FSL  1980 FEL
Bottom Hole Location:Sec:25 Twp: 6S 92W Footage: 110 FSL  1980 FEL
Proposed Depth/Form:7168 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 191-10 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 191-8 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:2/19/2008
Spud Date:2/6/2008Spud Date Is:ACTUAL
Measured TD:7100 ft.Measured PB depth:7043 ft.
True Vertical TD:7068 ft.True Vertical PB depth:7030 ft.
Top PZ Location:Sec:25 Twp: 6S 92WFootage: 114 FSL  1939 FEL
Bottom Hole Location:Sec:25 Twp: 6S 92WFootage: 114 FSL  1939 FEL
Log Types:HALLIBURTON HRI/DSN/SE; ACOUSTIC CBL; MUD
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 759 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 759 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7088 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 3100 ft., Bottom: 7088 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3216 ft.NN
ROLLINS6848 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 4/17/2008                 Interval Top: 4450 ft.    Interval Bottom: 6816 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/30/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2008
Treatment Summary:68,304 BBLS SLICKWATER; 1,497,800 LBS OF 20-40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:5183 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/17/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 106
CASING_PRESS 1050
MCF_GAS 106
TUBING_PRESS 1050
Perforation Data:
Interval Top:4450 ft.# Of Holes:214
Interval Bottom:6816 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)5175
GOR84836
GOR DeterminationMCFE
Average BOE per Day2.612
Average MCFE per Day15.174

 Federal Financial Assurance  i 

 Tribal Well  i No