Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15339
Well Classification: GW Status: PR - 11/21/2008
Well Name/No:FEDERAL #GM341-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27874
Facility Status:PRStatus Date11/21/2008
FacilityID:294233LocationID:334814
County:GARFIELD #045Location:NENE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5208 ft.
Basin:PICEANCE BASIN  
Planned Location:500FNL  409 FELLat/Long: 39.443445 / -108.069572Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.443442 / -108.069576Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/21/2008             Measured TD: 6026 ft.    Vertical TD: 6005 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/21/2008
Wellbore PermitDIRECTIONAL
Permit #:20076478 Expiration Date:1/6/2009
Proposed Top PZ Location:Sec: Twp: Footage: 127 FNL  411 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96W Footage: 127 FNL  411 FEL
Proposed Depth/Form:6031 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:7/10/2008
Spud Date:7/1/2008Spud Date Is:ACTUAL
Measured TD:6026 ft.Measured PB depth:5982 ft.
True Vertical TD:6005 ft.True Vertical PB depth:5961 ft.
Top PZ Location:Sec:14 Twp: 7S 96WFootage: 111 FNL  412 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96WFootage: 111 FNL  412 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 1124 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5998 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 752, Top: 3070 ft., Bottom: 5998 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1173 ft.NN
MESAVERDE2950 ft.NN
CAMEO5449 ft.NN
ROLLINS5929 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/21/2008                Interval Top: 4320 ft.    Interval Bottom: 5848 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/6/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/4/2008
Treatment Summary:2947 GALS 7 1/2% HCL; 727224# 30/50 SAND; 20349 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5496 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1188
CASING_PRESS 1556
MCF_GAS 1188
TUBING_PRESS 1471
Perforation Data:
Interval Top:4320 ft.# Of Holes:116
Interval Bottom:5848 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)22223
GOR766310
GOR DeterminationMCFE
Average BOE per Day10.574
Average MCFE per Day61.323

 Federal Financial Assurance  i Y

 Tribal Well  i No