Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15317
Well Classification: GW Status: PR - 1/7/2008
Well Name/No:CLOUGH #RWF 43-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2008
FacilityID:294209LocationID:335332
County:GARFIELD #045Location:SESE 22 6S94W 6
Field:RULISON - #75400Elevation:5219 ft.
Basin:PICEANCE BASIN  
Planned Location:879FSL  1123 FELLat/Long: 39.505920 / -107.869055Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.505911 / -107.869014Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/1/2007             Measured TD: 7795 ft.    Vertical TD: 7627 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/1/2007
Wellbore PermitDIRECTIONAL
Permit #:20076275 Expiration Date:1/3/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2010 FSL  583 FEL
Bottom Hole Location:Sec:22 Twp: 6S 94W Footage: 2010 FSL  583 FEL
Proposed Depth/Form:7833 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:3/4/2008
Spud Date:2/22/2008Spud Date Is:ACTUAL
Measured TD:7795 ft.Measured PB depth:7769 ft.
True Vertical TD:7627 ft.True Vertical PB depth:7601 ft.
Top PZ Location:Sec:22 Twp: 6S 94WFootage: 2006 FSL  582 FEL
Bottom Hole Location:Sec:22 Twp: 6S 94WFootage: 2006 FSL  582 FEL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 1650 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7772 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1380, Top: 2970 ft., Bottom: 7772 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1390 ft.NN
MESAVERDE4066 ft.NN
CAMEO6930 ft.NN
ROLLINS7795 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/31/2008                 Interval Top: 5506 ft.    Interval Bottom: 7668 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/26/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/19/2008
Treatment Summary:2931 GALS 7.5% HCL; 648,200# 20/40 SAND; 17,638 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7004 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 2090
MCF_GAS 1221
TUBING_PRESS 1952
Perforation Data:
Interval Top:5506 ft.# Of Holes:125
Interval Bottom:7668 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)12455
GOR778437
GOR DeterminationMCFE
Average BOE per Day5.929
Average MCFE per Day34.385

 Federal Financial Assurance  i 

 Tribal Well  i No