Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15235
Well Classification: GW Status: PR - 8/20/2008
Well Name/No:PUCKETT #SG 41-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/20/2008
FacilityID:105LocationID:334568
County:GARFIELD #045Location:SESE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5088 ft.
Basin:PICEANCE BASIN  
Planned Location:350FSL  738 FELLat/Long: 39.431234 / -108.070566Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.431233 / -108.070572Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/20/2008             Measured TD: 5644 ft.    Vertical TD: 5596 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/20/2008
Wellbore PermitDIRECTIONAL
Permit #:20076102 Expiration Date:1/27/2009
Proposed Top PZ Location:Sec: Twp: Footage: 188 FNL  935 FEL
Bottom Hole Location:Sec:23 Twp: 7S 96W Footage: 188 FNL  935 FEL
Proposed Depth/Form:5625 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:5/1/2008
Spud Date:4/24/2008Spud Date Is:ACTUAL
Measured TD:5644 ft.Measured PB depth:5589 ft.
True Vertical TD:5596 ft.True Vertical PB depth:5541 ft.
Top PZ Location:Sec:23 Twp: 7S 96WFootage: 169 FNL  913 FEL
Bottom Hole Location:Sec:23 Twp: 7S 96WFootage: 169 FNL  913 FEL
Log Types:CBL; HRI/SD/DSN; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1141 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1141 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5613 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 718, Top: 2090 ft., Bottom: 5613 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G879 ft.NN
MESAVERDE2661 ft.NN
CAMEO5068 ft.NN
ROLLINS5525 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/20/2008                 Interval Top: 3908 ft.    Interval Bottom: 5466 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/23/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/20/2008
Treatment Summary:965625# 30/50 SAND; 25581 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5064 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/2008Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 1529
CASING_PRESS 1568
MCF_GAS 1338
TUBING_PRESS 1525
Perforation Data:
Interval Top:3908 ft.# Of Holes:128
Interval Bottom:5466 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)14418
GOR600750
GOR DeterminationMCFE
Average BOE per Day6.883
Average MCFE per Day39.911

 Federal Financial Assurance  i 

 Tribal Well  i No