Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15103
Well Classification: GW Status: PR - 10/3/2008
Well Name/No:N. PARACHUTE #EF16C-30 I30A 5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/3/2008
FacilityID:293687LocationID:335807
County:GARFIELD #045Location:NESE 30 5S95W 6
Field:GRAND VALLEY - #31290Elevation:5935 ft.
Basin:PICEANCE BASIN  
Planned Location:1676FSL  1151 FELLat/Long: 39.582142 / -108.091469Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.582149 / -108.091482Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/3/2008             Measured TD: 9350 ft.    Vertical TD: 9186 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/3/2008
Wellbore PermitDIRECTIONAL
Permit #:20075541 Expiration Date:11/25/2008
Proposed Top PZ Location:Sec: Twp: Footage: 530 FSL  636 FEL
Bottom Hole Location:Sec:30 Twp: 5S 95W Footage: 530 FSL  636 FEL
Proposed Depth/Form:11012 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/25/2008
Spud Date:2/5/2008Spud Date Is:ACTUAL
Measured TD:9350 ft.Measured PB depth:9295 ft.
True Vertical TD:9186 ft.True Vertical PB depth:9131 ft.
Top PZ Location:Sec:30 Twp: 5S 95WFootage: 539 FSL  635 FEL
Bottom Hole Location:Sec:30 Twp: 5S 95WFootage: 539 FSL  635 FEL
Log Types:MUD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 257, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1940 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 1955 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9340 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1363, Top: 1450 ft., Bottom: 9350 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5644 ft.9207 ft.NN
ROLLINS9208 ft.9350 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/3/2008                 Interval Top: 5674 ft.    Interval Bottom: 9147 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/29/2008Choke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/18/2008
Treatment Summary:STAGES 1-11 TREATED WITH A TOTAL OF : 49871 BBLS SLICKWATER, 82400 LBS 20/40 SAND, 10500 LBS 30/50 SAND, 20000 LBS 40/70 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7745 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/3/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 45
BTU_GAS 1170
CASING_PRESS 2600
MCF_GAS 1100
TUBING_PRESS 1700
Perforation Data:
Interval Top:5674 ft.# Of Holes:330
Interval Bottom:9147 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)67
Total Gas Produced (MCF)12280
GOR183283
GOR DeterminationMCFE
Average BOE per Day5.975
Average MCFE per Day34.660

 Federal Financial Assurance  i 

 Tribal Well  i No