Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15078
Well Classification: GW Status: PR - 6/1/2018
Well Name/No:596-31A #27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2018
FacilityID:293642LocationID:335875
County:GARFIELD #045Location:NWNE 31 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8433 ft.
Basin:PICEANCE BASIN  
Planned Location:847FNL  1675 FELLat/Long: 39.576550 / -108.208140Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.576550 / -108.208140Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/4/2018
End Date: 6/10/2018
Reported: 7/30/2018
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2018             Measured TD: 10035 ft.    Vertical TD: 9776 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20075237 Expiration Date:11/22/2008
Proposed Top PZ Location:Sec:31 Twp: 5S 96W Footage: 2082 FNL  575 FEL
Bottom Hole Location:Sec:31 Twp: 5S 96W Footage: 2082 FNL  575 FEL
Proposed Depth/Form:9929 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:10/16/2008
Spud Date:9/3/2008Spud Date Is:ACTUAL
Measured TD:10035 ft.Measured PB depth:9968 ft.
True Vertical TD:9776 ft.True Vertical PB depth:9709 ft.
Top PZ Location:Sec:31 Twp: 5S 96WFootage: 2090 FNL  595 FEL
Bottom Hole Location:Sec:31 Twp: 5S 96WFootage: 2082 FNL  575 FEL
Log Types:
Log Types:NO LOGS RUN YET AND NO FORMATION TOPS YET. AS-DRILLED BHL AND TOP OF PROD. ZONE NOT YET CALCULATED.
Log Types:SONIC,CBL, PULSED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: , Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2845 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2241, Top: 0 ft., Bottom: 2845 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9984 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 904, Top: 4997 ft., Bottom: 9984 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4961 ft.NN
FORT UNION5276 ft.NN
MESAVERDE6742 ft.NN
CAMEO9309 ft.NN
ROLLINS9840 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/15/2018                 Interval Top: 8047 ft.    Interval Bottom: 9697 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/15/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/4/2018Treatment End Date:6/10/2018
Treatment Summary:7-stage plug-and-perf completion; 55991 total bbls fluid pumped: 55908 bbls recycled water (slickwater) and 83 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):55991Max pressure during treatment (psi):7318
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.56
Recycled water used in treatment (bbls):55908Total flowback volume recovered (bbls):23605
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9450 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/15/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1633
BTU_GAS 1080
CALC_BBLS_H2O 1633
CALC_MCF_GAS 493
CASING_PRESS 810
MCF_GAS 493
Perforation Data:
Interval Top:8047 ft.# Of Holes:189
Interval Bottom:9697 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)43
Total Gas Produced (MCF)50106
GOR1165255
GOR DeterminationMCFE
Average BOE per Day23.784
Average MCFE per Day137.928

 Federal Financial Assurance  i 

 Tribal Well  i No