Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15077
Well Classification: GW Status: PR - 7/1/2018
Well Name/No:596-31A #28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2018
FacilityID:293641LocationID:335875
County:GARFIELD #045Location:NWNE 31 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8433 ft.
Basin:PICEANCE BASIN  
Planned Location:854FNL  1675 FELLat/Long: 39.576530 / -108.208140Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.576530 / -108.208140Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/21/2018
End Date: 7/21/2018
Reported: 7/16/2019
Days to report: 360
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2018             Measured TD: 10098 ft.    Vertical TD: 9768 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20075236 Expiration Date:11/22/2008
Proposed Top PZ Location:Sec:31 Twp: 5S 96W Footage: 2406 FNL  581 FWL
Bottom Hole Location:Sec:31 Twp: 5S 96W Footage: 2406 FNL  581 FWL
Proposed Depth/Form:9999 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:10/23/2008
Spud Date:9/7/2008Spud Date Is:ACTUAL
Measured TD:10098 ft.Measured PB depth:10033 ft.
True Vertical TD:9768 ft.True Vertical PB depth:9703 ft.
Top PZ Location:Sec:31 Twp: 5S 96WFootage: 2416 FNL  580 FEL
Bottom Hole Location:Sec:31 Twp: 5S 96WFootage: 2406 FNL  581 FEL
Log Types:NO LOGS RUN YET AND NO FORMATION TOPS YET. AS-DRILLED BHL AND TOP OF PROD. ZONE NOT YET CALCULATED.
Log Types:MULTIPOLE ARRAY ACOUSTILOG, RADIAL ANALYSIS BOND LOG, RES.PERFORMANCE MONITOR, PULSED NEUTRON, CBL,SONIC
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: , Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2842 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1141, Top: 0 ft., Bottom: 2842 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10059 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 3330 ft., Bottom: 10059 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G5016 ft.NN
FORT UNION5347 ft.NN
MESAVERDE6809 ft.NN
CAMEO9362 ft.NN
ROLLINS9907 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/29/2018                 Interval Top: 8143 ft.    Interval Bottom: 9863 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/29/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2018Treatment End Date:7/25/2018
Treatment Summary:7-stage plug-and-perf completion; 56000 total bbls fluid pumped: 55917 bbls recycled water (slickwater) and 83 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):56000Max pressure during treatment (psi):6767
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.54
Recycled water used in treatment (bbls):55917Total flowback volume recovered (bbls):25475
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9596 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/29/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2160
BTU_GAS 1080
CALC_BBLS_H2O 2160
CALC_MCF_GAS 624
CASING_PRESS 625
MCF_GAS 624
Perforation Data:
Interval Top:8143 ft.# Of Holes:189
Interval Bottom:9863 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)43220
GOR1800833
GOR DeterminationMCFE
Average BOE per Day20.472
Average MCFE per Day118.734

 Federal Financial Assurance  i 

 Tribal Well  i No