Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15045
Well Classification: GW Status: PR - 7/20/2008
Well Name/No:CLOUGH #RWF 543-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/20/2008
FacilityID:293566LocationID:335332
County:GARFIELD #045Location:SESE 22 6S94W 6
Field:RULISON - #75400Elevation:5219 ft.
Basin:PICEANCE BASIN  
Planned Location:885FSL  1094 FELLat/Long: 39.505937 / -107.868951Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.505928 / -107.868908Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/20/2008             Measured TD: 7861 ft.    Vertical TD: 7769 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/20/2008
Wellbore PermitDIRECTIONAL
Permit #:20075894 Expiration Date:11/18/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1711 FSL  648 FEL
Bottom Hole Location:Sec:22 Twp: 6S 94W Footage: 1711 FSL  648 FEL
Proposed Depth/Form:7742 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:2/4/2008
Spud Date:1/21/2008Spud Date Is:ACTUAL
Measured TD:7861 ft.Measured PB depth:7808 ft.
True Vertical TD:7769 ft.True Vertical PB depth:7716 ft.
Top PZ Location:Sec:22 Twp: 6S 94WFootage: 1693 FSL  652 FEL
Bottom Hole Location:Sec:22 Twp: 6S 94WFootage: 1693 FSL  652 FEL
Log Types:CBL; HIGH RES.INDUCTION, SPECTRAL DENSITY DUAL SPACED NEUTRON, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1121 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1121 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7836 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1401, Top: 2830 ft., Bottom: 7836 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1382 ft.NN
MESAVERDE4000 ft.NN
CAMEO6833 ft.NN
ROLLINS7735 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/20/2008                 Interval Top: 5429 ft.    Interval Bottom: 7587 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/23/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/19/2008
Treatment Summary:3528 GALS 7.5% HCL; 720,500# 20/40 SAND; 20,135 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6936 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/20/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1246
CASING_PRESS 949
MCF_GAS 1246
TUBING_PRESS 819
Perforation Data:
Interval Top:5429 ft.# Of Holes:146
Interval Bottom:7587 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)26
Total Gas Produced (MCF)19930
GOR766538
GOR DeterminationMCFE
Average BOE per Day9.500
Average MCFE per Day55.093

 Federal Financial Assurance  i 

 Tribal Well  i No