Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15040
Well Classification: GW Status: PR - 6/29/2008
Well Name/No:BUSH #GM 323-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/29/2008
FacilityID:293567LocationID:334646
Municipality/County:PARACHUTE / GARFIELD #045Location:NWSW 12 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5203 ft.
Basin:PICEANCE BASIN  
Planned Location:1739FSL  804 FWLLat/Long: 39.449630 / -108.065311Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.449631 / -108.065314Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/29/2008             Measured TD: 6341 ft.    Vertical TD: 6032 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/29/2008
Wellbore PermitDIRECTIONAL
Permit #:20075480 Expiration Date:11/18/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1407 FSL  2300 FWL
Bottom Hole Location:Sec:12 Twp: 7S 96W Footage: 1407 FSL  2300 FWL
Proposed Depth/Form:6468 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-14 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:3/11/2008
Spud Date:3/2/2008Spud Date Is:ACTUAL
Measured TD:6341 ft.Measured PB depth:6282 ft.
True Vertical TD:6032 ft.True Vertical PB depth:5973 ft.
Top PZ Location:Sec:12 Twp: 7S 96WFootage: 1437 FSL  2292 FWL
Bottom Hole Location:Sec:12 Twp: 7S 96WFootage: 1437 FSL  2292 FWL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1162 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 1162 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6310 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 662, Top: 2300 ft., Bottom: 6310 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1295 ft.NN
MESAVERDE3326 ft.NN
CAMEO5888 ft.NN
ROLLINS6338 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/29/2008                 Interval Top: 4674 ft.    Interval Bottom: 6266 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/22/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/19/2008
Treatment Summary:3361 GALS 7.5% HCL; 912,900# 30/50 SAND; 24,645 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5742 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/29/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1303
CASING_PRESS 1292
MCF_GAS 1303
TUBING_PRESS 1113
Perforation Data:
Interval Top:4674 ft.# Of Holes:109
Interval Bottom:6266 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)16866
GOR581586
GOR DeterminationMCFE
Average BOE per Day8.049
Average MCFE per Day46.668

 Federal Financial Assurance  i 

 Tribal Well  i No