Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14980
Well Classification: GW Status: PR - 2/1/2021
Well Name/No:N. PARACHUTE #CP08B-16 B16 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2021
FacilityID:293428LocationID:335967
County:GARFIELD #045Location:NWNE 16 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8344 ft.
Basin:PICEANCE BASIN  
Planned Location:509FNL  2109 FELLat/Long: 39.620933 / -108.172253Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.620931 / -108.172251Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2021             Measured TD: 11075 ft.    Vertical TD: 10776 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20075032 Expiration Date:11/8/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1650 FNL  990 FEL
Bottom Hole Location:Sec:16 Twp: 5S 96W Footage: 1688 FNL  1030 FEL
Proposed Depth/Form:12194 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 12194 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 364, Top: 7313 ft., Bottom: 12194 ft.

Wellbore Completed
Completion Date:5/5/2008
Spud Date:2/22/2008Spud Date Is:ACTUAL
Measured TD:11075 ft.Measured PB depth:10926 ft.
True Vertical TD:10776 ft.True Vertical PB depth:10627 ft.
Top PZ Location:Sec:16 Twp: 5S 96WFootage: 1642 FNL  963 FEL
Bottom Hole Location:Sec:16 Twp: 5S 96WFootage: 1642 FNL  963 FEL
Log Types:USIT-GR, CBL-GR-CCL, RST-SIGMA-GR-CCL, MUD
Log Types:TEMP
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 92 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 92 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 2045 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1740, Top: 0 ft., Bottom: 2045 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11065 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 292, Top: 6706 ft., Bottom: 11065 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2699 ft.NN
OHIO CREEK7066 ft.NN
WILLIAMS FORK7371 ft.NN
CAMEO10300 ft.NN
ROLLINS10856 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 2/1/2021                  Interval Top: 7888 ft.    Interval Bottom: 10738 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/1/2008Choke Size:0.219 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/13/2008
Treatment Summary:FRAC'D W/ 56,775 BBLS SLICKWATER; 223,200# 100 MESH; 369,120# 40/70 JORDAN UNIMIN; 1,025,220# 20/40 JORDAN UNIMIN
Tubing Size:2.375 in.Tubing Setting Depth:8626 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 784
BTU_GAS 1052
CALC_BBLS_H2O 784
CALC_BBLS_OIL 0
CALC_MCF_GAS 460
CASING_PRESS 2025
MCF_GAS 460
TUBING_PRESS 1500
Perforation Data:
Interval Top:7888 ft.# Of Holes:270
Interval Bottom:10738 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)60
Total Gas Produced (MCF)9612
GOR160200
GOR DeterminationMCFE
Average BOE per Day4.717
Average MCFE per Day27.329

 Federal Financial Assurance  i 

 Tribal Well  i No