Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14964
Well Classification: GW Status: PR - 1/13/2012
Well Name/No:SCHOOL HOUSE POINT OM #13A L15 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/13/2012
FacilityID:293404LocationID:335979
County:GARFIELD #045Location:NWSW 15 6S96W 6
Field:GRAND VALLEY - #31290Elevation:8399 ft.
Basin:PICEANCE BASIN  
Planned Location:1727FSL  1250 FWLLat/Long: 39.520497 / -108.100247Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.520579 / -108.100227Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2012             Measured TD: 10217 ft.    Vertical TD: 10148 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2012
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:8/3/2012
Proposed Top PZ Location:Sec:15 Twp: 6S 96W Footage: 1258 FSL  621 FWL
Bottom Hole Location:Sec:15 Twp: 6S 96W Footage: 1240 FSL  587 FWL
Proposed Depth/Form:10325 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: NWSW
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9606 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 200 ft., Bottom: 9606 ft.
Casing:String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 10325 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 600, Top: , Bottom: 10325 ft.

Wellbore Completed
Completion Date:2/9/2011
Spud Date:1/29/2011Spud Date Is:ACTUAL
Measured TD:10217 ft.Measured PB depth:10217 ft.
True Vertical TD:10148 ft.True Vertical PB depth:10148 ft.
Top PZ Location:Sec:15 Twp: 6S 96WFootage: 1258 FSL  621 FWL
Bottom Hole Location:Sec:15 Twp: 6S 96WFootage: 1240 FSL  587 FWL
Log Types:CBL/RST combo to be run prior to completions.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 119 ft., Weight: 106 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 119 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2580 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 2442, Top: 0 ft., Bottom: 2881 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10124 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 656, Top: 4400 ft., Bottom: 10217 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.2778 ft.
WASATCH2778 ft.5415 ft.
FORT UNION5415 ft.6815 ft.
OHIO CREEK6815 ft.7015 ft.
WILLIAMS FORK7015 ft.9665 ft.
CAMEO9665 ft.10015 ft.
ROLLINS10015 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/1/2012                  Interval Top: 7517 ft.    Interval Bottom: 9552 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/17/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/31/2011
Treatment Summary:Well frac'd in 5 stages using 20/40 whitesand- 300,407 lbs and 30/50 whitesand- 267,696 lbs Fluid- 54,265 barrels and Acid- 2,500 gals
Tubing Size:2.375 in.Tubing Setting Depth:9270 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2011Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 931
BTU_GAS 1060
CALC_BBLS_H2O 931
CALC_MCF_GAS 1500
CASING_PRESS 1886
MCF_GAS 1500
TUBING_PRESS 762
Perforation Data:
Interval Top:7517 ft.# Of Holes:174
Interval Bottom:9552 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)35
Total Gas Produced (MCF)22884
GOR653828
GOR DeterminationMCFE
Average BOE per Day10.909
Average MCFE per Day63.262

 Federal Financial Assurance  i 

 Tribal Well  i No