|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2023 Measured TD: 10085 ft. Vertical TD: 9952 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/1/2016 | | Proposed Top PZ Location: | Sec:21 Twp: 6S 96W | Footage: 140 FNL 1711 FEL | | Bottom Hole Location: | Sec:21 Twp: 6S 96W | Footage: 179 FNL 1736 FEL | | Proposed Depth/Form: | 10217 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-49, 53, Unit Acreage: 11510, Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: 90 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10217 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 600, Top: , Bottom: 10217 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/20/2015 | | Spud Date: | 1/29/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 10085 ft. | Measured PB depth: | 10016 ft. | | True Vertical TD: | 9952 ft. | True Vertical PB depth: | 9883 ft. | | Top PZ Location: | Sec:21 Twp: 6S 96W | Footage: 140 FNL 1711 FEL | | Bottom Hole Location: | Sec:21 Twp: 6S 96W | Footage: 179 FNL 1736 FEL | | Log Types: | Cased-Hole & CBL run. Use Open-Hole Log run on School House Point OM01A A21 696 | API 05-045-14955-00. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 126 ft., Weight: 104.1 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 126 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2730 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1605, Top: 950 ft., Bottom: 2730 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10057 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1383, Top: 4676 ft., Bottom: 10057 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 1512 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 412, Top: 650 ft., Bottom: 1512 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 611 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 137, Top: 0 ft., Bottom: 611 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 7046 ft. | | | | | CAMEO | 9564 ft. | | | | | ROLLINS | 9900 ft. | | | |
Formation WMFK Formation Classification: GW Status: PR - 2/1/2023 Interval Top: 7668 ft. Interval Bottom: 9530 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 5/20/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/4/2015 | Treatment End Date: | 5/10/2015 | | Treatment Summary: | 71.43 BBLS HCL 7.5%; 101,627 BBLS RECYCLED PRODUCED WATER; 450 BBLS SCALE CHECK PILL | | Total fluid used in treatment (bbls): | 102148 | Max pressure during treatment (psi): | 6730 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.51 | | Recycled water used in treatment (bbls): | 101627 | Total flowback volume recovered (bbls): | 20511 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9106 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/3/2015 | Test Method: | PRODUCING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 543 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 543 | | CALC_MCF_GAS | 358 | | CASING_PRESS | 1550 | | MCF_GAS | 358 | | TUBING_PRESS | 625 |
| | Perforation Data: | | Interval Top: | 7668 ft. | # Of Holes: | 220 | | Interval Bottom: | 9530 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 46 |
| Total Gas Produced (MCF) | 24919 |
| GOR | 541717 |
| GOR Determination | MCFE |
| Average BOE per Day | 11.735 |
| Average MCFE per Day | 68.064 |
| Federal Financial Assurance | i | |
|
|