Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14955
Well Classification: GW Status: PR - 8/20/2015
Well Name/No:SCHOOL HOUSE POINT #OM1A A21 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/20/2015
FacilityID:293395LocationID:335516
County:GARFIELD #045Location:NENE 21 6S96W 6
Field:GRAND VALLEY - #31290Elevation:8312 ft.
Basin:PICEANCE BASIN  
Planned Location:202FNL  392 FELLat/Long: 39.515200 / -108.106064Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.515200 / -108.106064Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/20/2015             Measured TD: 10130 ft.    Vertical TD: 10126 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/20/2015
Wellbore PermitVERTICAL
Permit #: Expiration Date:10/16/2015
Proposed Top PZ Location:Sec:21 Twp: 6s 96w Footage: 202 FNL  420 FEL
Bottom Hole Location:Sec:21 Twp: 6s 96w Footage: 221 FNL  483 FEL
Proposed Depth/Form:10086 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-49, 53, Unit Acreage: 11510, Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 16.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10086 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 600, Top: , Bottom: 10086 ft.

Wellbore Completed
Completion Date:2/17/2015
Spud Date:2/2/2015Spud Date Is:ACTUAL
Measured TD:10130 ft.Measured PB depth:10052 ft.
True Vertical TD:10126 ft.True Vertical PB depth:
Top PZ Location:Sec:21 Twp: 6s 96wFootage: 202 FNL  420 FEL
Bottom Hole Location:Sec:21 Twp: 6s 96wFootage: 221 FNL  483 FEL
Log Types:OPEN HOLE, CASED HOLE, CBL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 126 ft., Weight: 104.1 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2730 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1605, Top: 1050 ft., Bottom: 2730 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10096 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1270, Top: 5920 ft., Bottom: 10096 ft., Determination Method: CBL
Additional Cement:String Type: S.C. 1.1 , Top: 0 ft., Depth: 2012 ft., Bottom: 2012 ft., Sacks: 500, Method: 1 INCH
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 125 ft., Sacks: 93, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6934 ft.
CAMEO9437 ft.
ROLLINS9765 ft.

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/20/2015                 Interval Top: 7694 ft.    Interval Bottom: 9568 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/7/2015Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/30/2015Treatment End Date:5/5/2015
Treatment Summary:71.43 BBLS HCL 7.5%; 108,035 BBLS RECYCLED PRODUCED WATER; 450 BBLS SCALE CHECK PILL
Total fluid used in treatment (bbls):108556Max pressure during treatment (psi):6700
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):450Min frac gradient (psi/ft):0.49
Recycled water used in treatment (bbls):108485Total flowback volume recovered (bbls):32264
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9257 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/2/2015Test Method:PRODUCING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 478
BTU_GAS 1004
CALC_BBLS_H2O 478
CALC_MCF_GAS 545
CASING_PRESS 1490
MCF_GAS 545
TUBING_PRESS 450
Perforation Data:
Interval Top:7694 ft.# Of Holes:218
Interval Bottom:9568 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)158
Total Gas Produced (MCF)77746
GOR492063
GOR DeterminationMCFE
Average BOE per Day37.715
Average MCFE per Day218.754

 Federal Financial Assurance  i 

 Tribal Well  i No