Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14932
Well Classification: GW Status: PR - 10/18/2008
Well Name/No:DIAMOND ELK #PA 333-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/18/2008
FacilityID:293272LocationID:334734
County:GARFIELD #045Location:SWSE 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6243 ft.
Basin:PICEANCE BASIN  
Planned Location:1058FSL  1381 FELLat/Long: 39.462683 / -107.942489Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.462681 / -107.942491Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/18/2008             Measured TD: 8340 ft.    Vertical TD: 8267 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/18/2008
Wellbore PermitDIRECTIONAL
Permit #:20074798 Expiration Date:11/1/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2029 FSL  1679 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 2029 FSL  1679 FEL
Proposed Depth/Form:8478 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:7/1/2008
Spud Date:6/22/2008Spud Date Is:ACTUAL
Measured TD:8340 ft.Measured PB depth:8285 ft.
True Vertical TD:8267 ft.True Vertical PB depth:8212 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 1946 FSL  1447 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 1946 FSL  1447 FEL
Log Types:CBL, MUD, HI-RES INDUCTION/SPECTRAL DENS/DUAL-SP NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1109 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1109 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8318 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 977, Top: 3240 ft., Bottom: 8318 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2530 ft.NN
MESAVERDE4798 ft.NN
CAMEO7332 ft.NN
ROLLINS8291 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/18/2008                Interval Top: 6179 ft.    Interval Bottom: 8211 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/16/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2008
Treatment Summary:3704 GALS. 7.5% HCL; 978,500# 30-50 SAND; 26,856 BBLS. SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7726 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/2008Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_MCF_GAS 1346
CASING_PRESS 1315
MCF_GAS 1066
TUBING_PRESS 1144
Perforation Data:
Interval Top:6179 ft.# Of Holes:146
Interval Bottom:8211 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)16242
GOR812100
GOR DeterminationMCFE
Average BOE per Day7.727
Average MCFE per Day44.835

 Federal Financial Assurance  i 

 Tribal Well  i No