Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14931
Well Classification: GW Status: PR - 9/15/2008
Well Name/No:DIAMOND ELK #PA 44-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/15/2008
FacilityID:293271LocationID:334734
County:GARFIELD #045Location:SWSE 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6243 ft.
Basin:PICEANCE BASIN  
Planned Location:1056FSL  1356 FELLat/Long: 39.462679 / -107.942402Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.462679 / -107.942404Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/15/2008             Measured TD: 8363 ft.    Vertical TD: 8311 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/15/2008
Wellbore PermitDIRECTIONAL
Permit #:20074800 Expiration Date:11/1/2008
Proposed Top PZ Location:Sec: Twp: Footage: 595 FSL  749 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 595 FSL  749 FEL
Proposed Depth/Form:8361 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:7/20/2008
Spud Date:7/11/2008Spud Date Is:ACTUAL
Measured TD:8363 ft.Measured PB depth:8309 ft.
True Vertical TD:8311 ft.True Vertical PB depth:8257 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 617 FSL  858 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 617 FSL  858 FEL
Log Types:CBL , MUD, R M T E
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1152 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1152 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8341 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 966, Top: 3580 ft., Bottom: 8341 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2486 ft.NN
MESAVERDE4745 ft.NN
CAMEO7231 ft.NN
ROLLINS8177 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/15/2008                 Interval Top: 6074 ft.    Interval Bottom: 8097 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/16/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2008
Treatment Summary:3545 GALS 7 1/2% HCL; 703450# 30/50 SAND; 19256 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7687 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/15/2008Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 976
CASING_PRESS 972
MCF_GAS 773
TUBING_PRESS 805
Perforation Data:
Interval Top:6074 ft.# Of Holes:129
Interval Bottom:8097 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)13389
GOR787588
GOR DeterminationMCFE
Average BOE per Day6.374
Average MCFE per Day36.984

 Federal Financial Assurance  i 

 Tribal Well  i No