Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14931
Well Classification: GW Status: PR - 9/15/2008
Well Name/No:DIAMOND ELK #PA 44-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/15/2008
FacilityID:293271LocationID:334734
County:GARFIELD #045Location:SWSE 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6243 ft.
Basin:PICEANCE BASIN  
Planned Location:1056FSL  1356 FELLat/Long: 39.462679 / -107.942402Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.462679 / -107.942404Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/15/2008             Measured TD: 8363 ft.    Vertical TD: 8311 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/15/2008
Wellbore PermitDIRECTIONAL
Permit #:20074800 Expiration Date:11/1/2008
Proposed Top PZ Location:Sec: Twp: Footage: 595 FSL  749 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 595 FSL  749 FEL
Proposed Depth/Form:8361 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:7/20/2008
Spud Date:7/11/2008Spud Date Is:ACTUAL
Measured TD:8363 ft.Measured PB depth:8309 ft.
True Vertical TD:8311 ft.True Vertical PB depth:8257 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 617 FSL  858 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 617 FSL  858 FEL
Log Types:CBL , MUD, R M T E
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1152 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1152 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8341 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 966, Top: 3580 ft., Bottom: 8341 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2486 ft.NN
MESAVERDE4745 ft.NN
CAMEO7231 ft.NN
ROLLINS8177 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/15/2008                 Interval Top: 6074 ft.    Interval Bottom: 8097 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/16/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2008
Treatment Summary:3545 GALS 7 1/2% HCL; 703450# 30/50 SAND; 19256 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7687 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/15/2008Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 976
CASING_PRESS 972
MCF_GAS 773
TUBING_PRESS 805
Perforation Data:
Interval Top:6074 ft.# Of Holes:129
Interval Bottom:8097 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)13561
GOR847562
GOR DeterminationMCFE
Average BOE per Day6.453
Average MCFE per Day37.438

 Federal Financial Assurance  i 

 Tribal Well  i No