Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14930
Well Classification: GW Status: PR - 9/30/2008
Well Name/No:DIAMOND ELK #PA 344-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/30/2008
FacilityID:293270LocationID:334734
County:GARFIELD #045Location:SWSE 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6243 ft.
Basin:PICEANCE BASIN  
Planned Location:1046FSL  1385 FELLat/Long: 39.462651 / -107.942501Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.462648 / -107.942504Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/30/2008             Measured TD: 8398 ft.    Vertical TD: 8255 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20074801 Expiration Date:11/1/2008
Proposed Top PZ Location:Sec: Twp: Footage: 152 FSL  501 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 152 FSL  501 FEL
Proposed Depth/Form:8432 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/S

Wellbore Completed
Completion Date:6/11/2008
Spud Date:5/31/2008Spud Date Is:ACTUAL
Measured TD:8398 ft.Measured PB depth:8326 ft.
True Vertical TD:8255 ft.True Vertical PB depth:8183 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 183 FSL  488 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 183 FSL  488 FEL
Log Types:MUD, CBL, HI-RES INDUCTION/SPEC-DENS/DUAL-SP-NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2743 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 2743 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8366 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 987, Top: 3510 ft., Bottom: 8366 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2481 ft.NN
MESAVERDE4830 ft.NN
CAMEO7292 ft.NN
ROLLINS8270 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/30/2008                 Interval Top: 6208 ft.    Interval Bottom: 8177 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/16/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2008
Treatment Summary:2995 GALS 7.5% HCL; 583,250# 30/50 SAND; 15,649 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7798 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2008Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 996
CASING_PRESS 1220
MCF_GAS 996
TUBING_PRESS 1049
Perforation Data:
Interval Top:6208 ft.# Of Holes:114
Interval Bottom:8177 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)14187
GOR834529
GOR DeterminationMCFE
Average BOE per Day6.752
Average MCFE per Day39.174

 Federal Financial Assurance  i 

 Tribal Well  i No