Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14928
Well Classification: GW Status: PR - 8/31/2008
Well Name/No:DIAMOND ELK #PA 434-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/31/2008
FacilityID:293268LocationID:334734
County:GARFIELD #045Location:SWSE 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6243 ft.
Basin:PICEANCE BASIN  
Planned Location:1038FSL  1406 FELLat/Long: 39.462629 / -107.942576Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.462626 / -107.942579Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/31/2008             Measured TD: 8245 ft.    Vertical TD: 8161 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20074802 Expiration Date:11/1/2008
Proposed Top PZ Location:Sec: Twp: Footage: 191 FSL  1866 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 191 FSL  1866 FEL
Proposed Depth/Form:8316 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:5/30/2008
Spud Date:5/22/2008Spud Date Is:ACTUAL
Measured TD:8245 ft.Measured PB depth:8192 ft.
True Vertical TD:8161 ft.True Vertical PB depth:8108 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 201 FSL  1838 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 201 FSL  1838 FEL
Log Types:MUD, CBL, R M T E
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1128 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8224 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 995, Top: 3505 ft., Bottom: 8224 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2471 ft.NN
MESAVERDE4776 ft.NN
CAMEO7186 ft.NN
ROLLINS8141 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/31/2008                 Interval Top: 6101 ft.    Interval Bottom: 8107 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/21/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/20/2008
Treatment Summary:3505 GALS 7.5% HCL; 861,000# 20/40 SAND; 23,156 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7542 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1117
CASING_PRESS 1401
MCF_GAS 1117
TUBING_PRESS 1202
Perforation Data:
Interval Top:6101 ft.# Of Holes:131
Interval Bottom:8107 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)11404
GOR760266
GOR DeterminationMCFE
Average BOE per Day5.432
Average MCFE per Day31.501

 Federal Financial Assurance  i 

 Tribal Well  i No