Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14879
Well Classification: GW Status: PR - 11/28/2008
Well Name/No:FEDERAL #PA 411-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date11/28/2008
FacilityID:293092LocationID:335171
County:GARFIELD #045Location:NENW 31 6S95W 6
Field:PARACHUTE - #67350Elevation:6123 ft.
Basin:PICEANCE BASIN  
Planned Location:581FNL  1703 FWLLat/Long: 39.486629 / -108.042664Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.486628 / -108.042669Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/28/2008             Measured TD: 7770 ft.    Vertical TD: 7690 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/28/2008
Wellbore PermitDIRECTIONAL
Permit #:20074617 Expiration Date:10/21/2008
Proposed Top PZ Location:Sec: Twp: Footage: 341 FNL  1060 FWL
Bottom Hole Location:Sec:31 Twp: 6S 95W Footage: 341 FNL  1060 FWL
Proposed Depth/Form:7825 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:8/22/2008
Spud Date:8/14/2008Spud Date Is:ACTUAL
Measured TD:7770 ft.Measured PB depth:7728 ft.
True Vertical TD:7690 ft.True Vertical PB depth:7648 ft.
Top PZ Location:Sec:31 Twp: 6S 95WFootage: 326 FNL  892 FWL
Bottom Hole Location:Sec:31 Twp: 6S 95WFootage: 326 FNL  892 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1132 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7758 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 841, Top: 3112 ft., Bottom: 7758 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2502 ft.NN
MESAVERDE4550 ft.NN
CAMEO7181 ft.NN
ROLLINS7666 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/28/2008                Interval Top: 5646 ft.    Interval Bottom: 7583 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/13/2008Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/6/2008
Treatment Summary:3024 GALS 7 1/2% HCL; 905500# 30/50 SAND; 25119 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7058 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/28/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CASING_PRESS 1776
MCF_GAS 1494
TUBING_PRESS 1194
Perforation Data:
Interval Top:5646 ft.# Of Holes:127
Interval Bottom:7583 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)22217
GOR822851
GOR DeterminationMCFE
Average BOE per Day10.573
Average MCFE per Day61.338

 Federal Financial Assurance  i Y

 Tribal Well  i No