Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14872
Well Classification: GW Status: PR - 10/22/2007
Well Name/No:FEDERAL #GM 43-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27743
Facility Status:PRStatus Date10/22/2007
FacilityID:293081LocationID:335171
County:GARFIELD #045Location:NENW 31 6S95W 6
Field:GRAND VALLEY - #31290Elevation:6123 ft.
Basin:PICEANCE BASIN  
Planned Location:566FNL  1713 FWLLat/Long: 39.486669 / -108.042627Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.486668 / -108.042632Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/8/2007             Measured TD: 8330 ft.    Vertical TD: 7746 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/8/2007
Wellbore PermitDIRECTIONAL
Permit #:20074607 Expiration Date:10/21/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1555 FSL  204 FEL
Bottom Hole Location:Sec:25 Twp: 6S 95W Footage: 1555 FSL  204 FEL
Proposed Depth/Form:8400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:8/2/2008
Spud Date:7/22/2008Spud Date Is:ACTUAL
Measured TD:8330 ft.Measured PB depth:8277 ft.
True Vertical TD:7746 ft.True Vertical PB depth:7693 ft.
Top PZ Location:Sec:25 Twp: 6S 96WFootage: 1591 FSL  194 FEL
Bottom Hole Location:Sec:25 Twp: 6S 96WFootage: 1591 FSL  194 FEL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3010 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 0 ft., Bottom: 3010 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8312 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 3740 ft., Bottom: 8312 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2507 ft.NN
MESAVERDE5027 ft.NN
CAMEO7755 ft.NN
ROLLINS8252 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/29/2009                 Interval Top: 6309 ft.    Interval Bottom: 8169 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/9/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/29/2008
Treatment Summary:3031 GALS 7.5% HCL; 701,500# 30/50 SAND; 20,114 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7473 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/29/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1047
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 312
MCF_GAS 598
TUBING_PRESS 267
Perforation Data:
Interval Top:6309 ft.# Of Holes:112
Interval Bottom:8169 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)13965
GOR821470
GOR DeterminationMCFE
Average BOE per Day6.640
Average MCFE per Day38.532

 Federal Financial Assurance  i Y

 Tribal Well  i No