Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14868
Well Classification: GW Status: PR - 11/30/2008
Well Name/No:FEDERAL #PA 314-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date11/30/2008
FacilityID:293077LocationID:335171
County:GARFIELD #045Location:NENW 31 6S95W 6
Field:PARACHUTE - #67350Elevation:6123 ft.
Basin:PICEANCE BASIN  
Planned Location:560FNL  1727 FWLLat/Long: 39.486684 / -108.042578Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.486683 / -108.042582Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/30/2008             Measured TD: 8390 ft.    Vertical TD: 7784 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20074610 Expiration Date:10/21/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1349 FSL  165 FWL
Bottom Hole Location:Sec:30 Twp: 6S 95W Footage: 1349 FSL  165 FWL
Proposed Depth/Form:8416 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/17/2008
Spud Date:6/7/2008Spud Date Is:ACTUAL
Measured TD:8390 ft.Measured PB depth:8320 ft.
True Vertical TD:7784 ft.True Vertical PB depth:7714 ft.
Top PZ Location:Sec:30 Twp: 6S 95WFootage: 1362 FNL  175 FWL
Bottom Hole Location:Sec:30 Twp: 6S 95WFootage: 1362 FNL  175 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2994 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 653, Top: 0 ft., Bottom: 2994 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8354 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 855, Top: 4020 ft., Bottom: 8354 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5049 ft.NN
CAMEO7710 ft.NN
ROLLINS8273 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2008                Interval Top: 6251 ft.    Interval Bottom: 8175 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/26/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/17/2008
Treatment Summary:836768# 30/50 SAND; 24923 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7730 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CASING_PRESS 1269
MCF_GAS 1678
TUBING_PRESS 968
Perforation Data:
Interval Top:6251 ft.# Of Holes:114
Interval Bottom:8175 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)9247
GOR440333
GOR DeterminationMCFE
Average BOE per Day4.426
Average MCFE per Day25.688

 Federal Financial Assurance  i Y

 Tribal Well  i No