|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/5/2017 Measured TD: 9510 ft. Vertical TD: 9117 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/5/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/4/2018 | | Proposed Top PZ Location: | Sec:23 Twp: 6S 97W | Footage: 2601 FNL 2389 FEL | | Bottom Hole Location: | Sec:23 Twp: 6S 97W | Footage: 2601 FNL 2389 FEL | | Proposed Depth/Form: | 9509 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 40# , Citings Type: PLANNED | | Cement: | Sacks: 829, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9509 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 884, Top: 4441 ft., Bottom: 9509 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/25/2016 | | Spud Date: | 10/18/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 9510 ft. | Measured PB depth: | 9456 ft. | | True Vertical TD: | 9117 ft. | True Vertical PB depth: | 9063 ft. | | Top PZ Location: | Sec:23 Twp: 6S 97W | Footage: 2523 FNL 2237 FEL | | Bottom Hole Location: | Sec:23 Twp: 6S 97W | Footage: 2571 FNL 2323 FEL | | Log Types: | CBL, PNL | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2529 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 940, Top: 0 ft., Bottom: 2529 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9496 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 941, Top: 3650 ft., Bottom: 9496 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 2773 ft. | | N | N | | WASATCH G | 4851 ft. | | N | N | | FORT UNION | 5168 ft. | | N | N | | OHIO CREEK | 6449 ft. | | N | N | | WILLIAMS FORK | 6672 ft. | | N | N | | CAMEO | 8897 ft. | | N | N | | ROLLINS | 9354 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 8/5/2017 Interval Top: 7512 ft. Interval Bottom: 9310 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/5/2017 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/26/2017 | Treatment End Date: | 7/30/2017 | | Treatment Summary: | Frac'd with 56,000 bbls slickwater and 134 bbls 7.5% HCl acid. | | Total fluid used in treatment (bbls): | 56000 | Max pressure during treatment (psi): | 8392 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 134 | Min frac gradient (psi/ft): | 0.46 | | Recycled water used in treatment (bbls): | 55866 | Total flowback volume recovered (bbls): | 30250 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9074 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/5/2017 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 985 | | BTU_GAS | 1056 | | CALC_BBLS_H2O | 985 | | CALC_MCF_GAS | 95 | | CASING_PRESS | 450 | | MCF_GAS | 95 |
| | Perforation Data: | | Interval Top: | 7512 ft. | # Of Holes: | 189 | | Interval Bottom: | 9310 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 79 |
| Total Gas Produced (MCF) | 41191 |
| GOR | 521405 |
| GOR Determination | MCFE |
| Average BOE per Day | 19.653 |
| Average MCFE per Day | 113.987 |
| Federal Financial Assurance | i | |
|
|