Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14851
Well Classification: GW Status: PR - 12/25/2008
Well Name/No:FEDERAL #PA 543-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date12/25/2008
FacilityID:293051LocationID:335414
County:GARFIELD #045Location:SENE 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5388 ft.
Basin:PICEANCE BASIN  
Planned Location:2199FNL  643 FELLat/Long: 39.482077 / -108.033383Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.482074 / -108.033384Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/25/2008             Measured TD: 7220 ft.    Vertical TD: 6960 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/25/2008
Wellbore PermitDIRECTIONAL
Permit #:20074649 Expiration Date:10/18/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1614 FSL  222 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95W Footage: 1594 FSL  149 FEL
Proposed Depth/Form:7150 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:8/11/2008
Spud Date:7/31/2008Spud Date Is:ACTUAL
Measured TD:7220 ft.Measured PB depth:7110 ft.
True Vertical TD:6960 ft.True Vertical PB depth:6850 ft.
Top PZ Location:Sec:31 Twp: 6S 95WFootage: 1590 FSL  141 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95WFootage: 1590 FSL  141 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1989 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 0 ft., Bottom: 1989 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7199 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 2650 ft., Bottom: 7199 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE3878 ft.NN
CAMEO6384 ft.NN
ROLLINS7016 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/25/2008                Interval Top: 5196 ft.    Interval Bottom: 6912 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/4/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/2/2008
Treatment Summary:3004 GALS 7 1/2% HCL; 804,200# 20/40 SAND; 22,256 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6376 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/25/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_GOR 0
CASING_PRESS 539
MCF_GAS 1104
TUBING_PRESS 366
Perforation Data:
Interval Top:5196 ft.# Of Holes:122
Interval Bottom:6912 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)17347
GOR619535
GOR DeterminationMCFE
Average BOE per Day8.272
Average MCFE per Day47.976

 Federal Financial Assurance  i Y

 Tribal Well  i No