Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14849
Well Classification: GW Status: PR - 11/1/2008
Well Name/No:FEDERAL #PA 343-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date11/1/2008
FacilityID:293046LocationID:335414
County:GARFIELD #045Location:SENE 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5388 ft.
Basin:PICEANCE BASIN  
Planned Location:2220FNL  665 FELLat/Long: 39.482020 / -108.033461Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.482017 / -108.033462Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/1/2008             Measured TD: 6890 ft.    Vertical TD: 6870 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/1/2008
Wellbore PermitDIRECTIONAL
Permit #:20074647 Expiration Date:10/18/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2573 FSL  745 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95W Footage: 2573 FSL  745 FEL
Proposed Depth/Form:6949 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:6/28/2008
Spud Date:6/17/2008Spud Date Is:ACTUAL
Measured TD:6890 ft.Measured PB depth:6828 ft.
True Vertical TD:6870 ft.True Vertical PB depth:6808 ft.
Top PZ Location:Sec:31 Twp: 6S 95WFootage: 2591 FSL  745 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95WFootage: 2591 FSL  745 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1135 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 433, Top: 0 ft., Bottom: 1135 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6860 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1048, Top: 2700 ft., Bottom: 6860 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1348 ft.NN
MESAVERDE3650 ft.NN
CAMEO6192 ft.NN
ROLLINS6821 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/1/2008                 Interval Top: 4938 ft.    Interval Bottom: 6709 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/9/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2008
Treatment Summary:780,500 30/50 SAND; 20,050 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6302 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/1/2008Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1163
CASING_PRESS 904
MCF_GAS 921
TUBING_PRESS 752
Perforation Data:
Interval Top:4938 ft.# Of Holes:115
Interval Bottom:6709 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)16539
GOR612555
GOR DeterminationMCFE
Average BOE per Day7.882
Average MCFE per Day45.749

 Federal Financial Assurance  i Y

 Tribal Well  i No