Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14835
Well Classification: GW Status: PR - 10/31/2008
Well Name/No:FEDERAL #PA 314-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date10/31/2008
FacilityID:293019LocationID:334826
County:GARFIELD #045Location:SESW 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5561 ft.
Basin:PICEANCE BASIN  
Planned Location:596FSL  1217 FWLLat/Long: 39.475760 / -108.044404Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.475761 / -108.044411Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/31/2008             Measured TD: 7232 ft.    Vertical TD: 7076 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20074628 Expiration Date:10/16/2008
Proposed Top PZ Location:Sec:31 Twp: 6S 95W Footage: 1216 FSL  225 FWL
Bottom Hole Location:Sec:31 Twp: 6S 95W Footage: 1216 FSL  225 FWL
Proposed Depth/Form:7283 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:7/6/2008
Spud Date:6/28/2008Spud Date Is:ACTUAL
Measured TD:7232 ft.Measured PB depth:7170 ft.
True Vertical TD:7076 ft.True Vertical PB depth:7014 ft.
Top PZ Location:Sec:31 Twp: 6S 95WFootage: 1216 FSL  225 FWL
Bottom Hole Location:Sec:31 Twp: 6S 95WFootage: 1216 FSL  225 FWL
Log Types:CBL, HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2180 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 2180 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7218 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 3520 ft., Bottom: 7218 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE3943 ft.NN
CAMEO6501 ft.NN
ROLLINS7083 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/31/2008                Interval Top: 5266 ft.    Interval Bottom: 7020 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/17/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/13/2008
Treatment Summary:2500 GALS 7 1/2% HCL; 704600 # 20/40 SAND; 17443 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6667 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 1017
CASING_PRESS 870
MCF_GAS 1017
TUBING_PRESS 690
Perforation Data:
Interval Top:5266 ft.# Of Holes:110
Interval Bottom:7020 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)39
Total Gas Produced (MCF)28912
GOR741333
GOR DeterminationMCFE
Average BOE per Day13.768
Average MCFE per Day79.841

 Federal Financial Assurance  i Y

 Tribal Well  i No