Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14817
Well Classification: GW Status: PR - 5/1/2023
Well Name/No:N. PARACHUTE #CP14D-07 N07 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC-65768
Facility Status:PRStatus Date5/1/2023
FacilityID:292914LocationID:335956
County:GARFIELD #045Location:Lot 4 7 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8118 ft.
Basin:PICEANCE BASIN  
Planned Location:294FSL  1297 FWLLat/Long: 39.623142 / -108.213044Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.623144 / -108.213060Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2023             Measured TD: 9830 ft.    Vertical TD: 9818 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2023
Wellbore PermitDIRECTIONAL
Permit #:20074023 Expiration Date:10/11/2008
Proposed Top PZ Location:Sec: Twp: Footage: 321 FSL  1363 FWL
Bottom Hole Location:Sec:7 Twp: 5S 96W Footage: 321 FSL  1363 FWL
Proposed Depth/Form:10875 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-35 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/25/2008
Spud Date:12/3/2007Spud Date Is:ACTUAL
Measured TD:9830 ft.Measured PB depth:9754 ft.
True Vertical TD:9818 ft.True Vertical PB depth:9741 ft.
Top PZ Location:Sec:7 Twp: 5S 96WFootage: 374 FSL  1447 FWL
Bottom Hole Location:Sec:7 Twp: 5S 96WFootage: 374 FSL  1447 FWL
Log Types:USIT (2), GR, MUD (2), CBL (2)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 80 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 2032 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 2844, Top: 0 ft., Bottom: 2032 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6937 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1180, Top: 4780 ft., Bottom: 6937 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 9820 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 6736 ft., Bottom: 9820 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH A2311 ft.NN
WASATCH4766 ft.NN
OHIO CREEK5993 ft.NN
WILLIAMS FORK6448 ft.NN
CAMEO9030 ft.NN
ROLLINS9570 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/1/2023                  Interval Top: 7099 ft.    Interval Bottom: 9396 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/10/2009Choke Size:0.188 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/19/2008
Treatment Summary:FRAC'D WITH 35139 BBLS SLICK WATER, 133715 LBS 100 MESH, 750812 LBS 20/40 JORDAN UNIMIN
Tubing Size:2.375 in.Tubing Setting Depth:8206 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/10/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1047
CALC_GOR 0
CALC_MCF_GAS 1114
CASING_PRESS 1600
MCF_GAS 1114
TUBING_PRESS 1330
Perforation Data:
Interval Top:7099 ft.# Of Holes:186
Interval Bottom:9396 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)74
Total Gas Produced (MCF)14030
GOR189594
GOR DeterminationMCFE
Average BOE per Day6.838
Average MCFE per Day39.640

 Federal Financial Assurance  i Y

 Tribal Well  i No