Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14787
Well Classification: GW Status: PR - 6/2/2009
Well Name/No:AP #444-14-696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/2/2009
FacilityID:292781LocationID:335089
County:GARFIELD #045Location:SWSE 14 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6664 ft.
Basin:PICEANCE BASIN  
Planned Location:144FSL  1753 FELLat/Long: 39.516173 / -108.073646Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.516169 / -108.073650Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/2/2009             Measured TD: 8855 ft.    Vertical TD: 8647 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/2/2009
Wellbore PermitDIRECTIONAL
Permit #:20074163 Expiration Date:10/3/2008
Proposed Top PZ Location:Sec: Twp: Footage: 414 FSL  443 FEL
Bottom Hole Location:Sec:14 Twp: 6S 96W Footage: 414 FSL  443 FEL
Proposed Depth/Form:8827 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: , Drill Unit: S/2

Wellbore Completed
Completion Date:9/22/2008
Spud Date:9/5/2008Spud Date Is:ACTUAL
Measured TD:8855 ft.Measured PB depth:8769 ft.
True Vertical TD:8647 ft.True Vertical PB depth:8561 ft.
Top PZ Location:Sec:14 Twp: 6S 96WFootage: 413 FSL  443 FEL
Bottom Hole Location:Sec:14 Twp: 6S 96WFootage: 413 FSL  443 FEL
Log Types:CBL, HRI, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD, RMTE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2497 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 2497 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8865 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1081, Top: 3920 ft., Bottom: 8865 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5494 ft.NN
CAMEO8222 ft.NN
ROLLINS8682 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/2/2009                  Interval Top: 6809 ft.    Interval Bottom: 8655 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/2/2009Choke Size:0.281 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/2/2009
Treatment Summary:262,500 GAL 10% HCL ACID, 901,509 # 100 MESH AND 30/50 SAND, 29,666 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8504 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/2/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 989
CALC_GOR 0
CASING_PRESS 1750
MCF_GAS 1900
TUBING_PRESS 1700
Perforation Data:
Interval Top:6809 ft.# Of Holes:149
Interval Bottom:8655 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)26828
GOR706000
GOR DeterminationMCFE
Average BOE per Day12.775
Average MCFE per Day74.081

 Federal Financial Assurance  i 

 Tribal Well  i No