Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14786
Well Classification: GW Status: PR - 6/24/2010
Well Name/No:AP #331-23-696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/24/2010
FacilityID:292782LocationID:335089
County:GARFIELD #045Location:SWSE 14 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6664 ft.
Basin:PICEANCE BASIN  
Planned Location:99FSL  1752 FELLat/Long: 39.516050 / -108.073646Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.516046 / -108.073649Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/24/2010             Measured TD: 8646 ft.    Vertical TD: 8595 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/24/2010
Wellbore PermitDIRECTIONAL
Permit #:20086358 Expiration Date:11/12/2009
Proposed Top PZ Location:Sec: Twp: Footage: 428 FNL  1912 FEL
Bottom Hole Location:Sec:23 Twp: 6S 96W Footage: 428 FNL  1912 FEL
Proposed Depth/Form:8614 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-14 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:12/20/2008
Spud Date:12/10/2008Spud Date Is:ACTUAL
Measured TD:8646 ft.Measured PB depth:8531 ft.
True Vertical TD:8595 ft.True Vertical PB depth:8478 ft.
Top PZ Location:Sec:23 Twp: 6S 96WFootage: 463 FNL  2180 FEL
Bottom Hole Location:Sec:23 Twp: 6S 96WFootage: 463 FNL  2180 FEL
Log Types:CBL, HRL, SPECTRAL DENSITY, TRIPLE COMBO, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2501 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 2501 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8662 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 4450 ft., Bottom: 8662 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5252 ft.NN
CAMEO7997 ft.NN
ROLLINS8462 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/24/2010                 Interval Top: 6470 ft.    Interval Bottom: 8425 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/13/2009Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/13/2009
Treatment Summary:8500 GAL 10% HCL ACID, 1167202# 30/50 & 100 MESH SAND, 35556 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8213 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1050
CALC_GOR 0
CASING_PRESS 1900
MCF_GAS 1900
TUBING_PRESS 1600
Perforation Data:
Interval Top:6470 ft.# Of Holes:174
Interval Bottom:8425 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)50
Total Gas Produced (MCF)21715
GOR434300
GOR DeterminationMCFE
Average BOE per Day10.399
Average MCFE per Day60.322

 Federal Financial Assurance  i 

 Tribal Well  i No