Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14777
Well Classification: GW Status: PR - 6/24/2010
Well Name/No:AP #341-23-696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/24/2010
FacilityID:292791LocationID:335089
County:GARFIELD #045Location:SWSE 14 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6664 ft.
Basin:PICEANCE BASIN  
Planned Location:122FSL  1752 FELLat/Long: 39.516112 / -108.073646Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.516107 / -108.073650Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/24/2010             Measured TD: 8816 ft.    Vertical TD: 8616 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/24/2010
Wellbore PermitDIRECTIONAL
Permit #:20086360 Expiration Date:11/12/2009
Proposed Top PZ Location:Sec: Twp: Footage: 533 FNL  594 FEL
Bottom Hole Location:Sec:23 Twp: 6S 96W Footage: 533 FNL  594 FEL
Proposed Depth/Form:8772 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-14 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:11/12/2008
Spud Date:10/31/2008Spud Date Is:ACTUAL
Measured TD:8816 ft.Measured PB depth:8780 ft.
True Vertical TD:8616 ft.True Vertical PB depth:8580 ft.
Top PZ Location:Sec:23 Twp: 6S 96WFootage: 537 FNL  594 FEL
Bottom Hole Location:Sec:23 Twp: 6S 96WFootage: 537 FNL  594 FEL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2491 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 2491 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8811 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 4350 ft., Bottom: 8811 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5401 ft.NN
CAMEO8186 ft.NN
ROLLINS8621 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/24/2010                 Interval Top: 6770 ft.    Interval Bottom: 8596 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/23/2009Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/23/2009
Treatment Summary:9500 GAL 10% HCL ACID, 1325325# 30/50 & 100 MESH SAND, 40627 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8371 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/27/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1006
CALC_GOR 0
CASING_PRESS 2500
MCF_GAS 3200
TUBING_PRESS 2100
Perforation Data:
Interval Top:6770 ft.# Of Holes:178
Interval Bottom:8596 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)65
Total Gas Produced (MCF)28674
GOR441138
GOR DeterminationMCFE
Average BOE per Day13.735
Average MCFE per Day79.665

 Federal Financial Assurance  i 

 Tribal Well  i No