Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14732
Well Classification: GW Status: PR - 5/1/2018
Well Name/No:596-33C #23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2018
FacilityID:292485LocationID:335880
County:GARFIELD #045Location:SWSW 33 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8243 ft.
Basin:PICEANCE BASIN  
Planned Location:261FSL  1308 FWLLat/Long: 39.565110 / -108.178840Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.565110 / -108.178840Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/6/2018
End Date: 5/9/2018
Reported: 5/15/2018
Days to report: 6
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2018             Measured TD: 10286 ft.    Vertical TD: 10025 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20074251 Expiration Date:9/27/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1803 FSL  1984 FWL
Bottom Hole Location:Sec:33 Twp: 5S 96W Footage: 1803 FSL  1984 FWL
Proposed Depth/Form:10134 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:9/22/2008
Spud Date:5/28/2008Spud Date Is:ACTUAL
Measured TD:10286 ft.Measured PB depth:10135 ft.
True Vertical TD:10025 ft.True Vertical PB depth:9934 ft.
Top PZ Location:Sec:33 Twp: 5S 96WFootage: 1799 FSL  2032 FWL
Bottom Hole Location:Sec:33 Twp: 5S 96WFootage: 1758 FSL  1960 FWL
Log Types:NO LOGS RUN YET AND NO FORMATION TOPS YET. AS DRILLED BHL AND TOP OF PROD ZONE NOT YET CALCULATED.
Log Types:NO LOGS RUN/FORMATION TOPS YET.GPS DATA NOT TAKEN,RIG IS STILL ON PAD
Log Types:DIGITAL ACOUSTILOG GAMMA RAY, RADIAL ANALYSIS BOND LONG, RESEVOIR PERFORMANCE MONITOR
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 140 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2956 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1624, Top: 0 ft., Bottom: 2956 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10268 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 831, Top: 2110 ft., Bottom: 10268 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4982 ft.NN
FORT UNION5330 ft.NN
MESAVERDE6919 ft.NN
CAMEO9551 ft.NN
ROLLINS10093 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/13/2018                 Interval Top: 8157 ft.    Interval Bottom: 10008 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/13/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/6/2018Treatment End Date:5/9/2018
Treatment Summary:7-stage plug-and-perf completion; 56061 total bbls fluid pumped: 55978 bbls recycled water (slickwater) and 83 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):56061Max pressure during treatment (psi):9261
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.55
Recycled water used in treatment (bbls):55978Total flowback volume recovered (bbls):28172
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9701 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/13/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1600
BTU_GAS 1080
CALC_BBLS_H2O 1600
CALC_MCF_GAS 1178
CASING_PRESS 1000
MCF_GAS 1178
Perforation Data:
Interval Top:8157 ft.# Of Holes:189
Interval Bottom:10008 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)70
Total Gas Produced (MCF)44599
GOR637128
GOR DeterminationMCFE
Average BOE per Day21.273
Average MCFE per Day123.376

 Federal Financial Assurance  i 

 Tribal Well  i No