Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14722
Well Classification: GW Status: PR - 12/25/2008
Well Name/No:FEDERAL #PA 442-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date12/25/2008
FacilityID:292426LocationID:335414
County:GARFIELD #045Location:SENE 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5388 ft.
Basin:PICEANCE BASIN  
Planned Location:2181FNL  639 FELLat/Long: 39.482125 / -108.033369Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.482121 / -108.033369Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/25/2008             Measured TD: 6973 ft.    Vertical TD: 6929 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/25/2008
Wellbore PermitDIRECTIONAL
Permit #:20074645 Expiration Date:9/24/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1774 FNL  820 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95W Footage: 1780 FNL  1053 FEL
Proposed Depth/Form:6974 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:9/6/2008
Spud Date:8/30/2008Spud Date Is:ACTUAL
Measured TD:6973 ft.Measured PB depth:6898 ft.
True Vertical TD:6929 ft.True Vertical PB depth:6854 ft.
Top PZ Location:Sec:31 Twp: 6S 95WFootage: 1755 FNL  1043 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95WFootage: 1755 FNL  1043 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 742 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 742 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6953 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 1810 ft., Bottom: 6953 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE3685 ft.NN
CAMEO6268 ft.NN
ROLLINS6838 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/25/2008                Interval Top: 4983 ft.    Interval Bottom: 6762 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/4/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/2/2008
Treatment Summary:3500 GALS 7 1/2% HCL; 907400 20/40 SAND; 25326 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6374 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/25/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_GOR 0
CASING_PRESS 1063
MCF_GAS 1185
TUBING_PRESS 844
Perforation Data:
Interval Top:4983 ft.# Of Holes:142
Interval Bottom:6762 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)26
Total Gas Produced (MCF)16033
GOR616653
GOR DeterminationMCFE
Average BOE per Day7.642
Average MCFE per Day44.353

 Federal Financial Assurance  i Y

 Tribal Well  i No