Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14694
Well Classification: GW Status: SI - 12/1/2025
Well Name/No:WILLIAMS #GM 413-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2025
FacilityID:292351LocationID:335145
County:GARFIELD #045Location:NESW 36 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5596 ft.
Basin:PICEANCE BASIN  
Planned Location:2109FSL  1691 FWLLat/Long: 39.479090 / -108.060690Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.479097 / -108.060695Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2025             Measured TD: 7189 ft.    Vertical TD: 7023 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20073746 Expiration Date:9/19/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1850 FSL  483 FWL
Bottom Hole Location:Sec: Twp: Footage: 1850 FSL  483 FWL
Proposed Depth/Form:7148 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:12/3/2007
Spud Date:11/24/2007Spud Date Is:ACTUAL
Measured TD:7189 ft.Measured PB depth:7140 ft.
True Vertical TD:7023 ft.True Vertical PB depth:6974 ft.
Top PZ Location:Sec:36 Twp: 6S 96WFootage: 1837 FSL  490 FEL
Bottom Hole Location:Sec:36 Twp: 6S 96WFootage: 1837 FSL  490 FEL
Log Types:CBL; HIGH RES.INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1141 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1141 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7167 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 861, Top: 2900 ft., Bottom: 7167 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2047 ft.NN
MESAVERDE3970 ft.NN
CAMEO6548 ft.NN
ROLLINS7069 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 12/1/2025                 Interval Top: 5224 ft.    Interval Bottom: 6923 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/21/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/15/2008
Treatment Summary:2985 GALS 7.5% HCL; 972,000# 30/50 SAND; 26,219 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6478 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1098
CASING_PRESS 642
MCF_GAS 870
TUBING_PRESS 392
Perforation Data:
Interval Top:5224 ft.# Of Holes:125
Interval Bottom:6923 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)11854
GOR846714
GOR DeterminationMCFE
Average BOE per Day5.662
Average MCFE per Day32.844

 Federal Financial Assurance  i 

 Tribal Well  i No