Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14693
Well Classification: DSPW Status: IJ - 9/1/2025
Well Name/No:WILLIAMS #GM 239-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date9/1/2025
FacilityID:292352LocationID:335145
County:GARFIELD #045Location:NESW 36 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5597 ft.
Basin:PICEANCE BASIN  
Planned Location:2122FSL  1683 FWLLat/Long: 39.479130 / -108.060723Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.479130 / -108.060723Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: IJ - 9/1/2025             Measured TD: 7116 ft.    Vertical TD: 7031 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        IJ - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/30/2013
Proposed Top PZ Location:Sec:36 Twp: 6S 96W Footage: 2152 FSL  780 FWL
Bottom Hole Location:Sec:36 Twp: 6S 96W Footage: 2160 FSL  802 FWL
Proposed Depth/Form:7092 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1122 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 325, Top: 0 ft., Bottom: 1122 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7092 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 853, Top: 2390 ft., Bottom: 7092 ft.

Wellbore Completed
Completion Date:11/22/2007
Spud Date:11/14/2007Spud Date Is:ACTUAL
Measured TD:7116 ft.Measured PB depth:7050 ft.
True Vertical TD:7031 ft.True Vertical PB depth:6965 ft.
Top PZ Location:Sec:36 Twp: 6S 96WFootage: 2152 FSL  780 FWL
Bottom Hole Location:Sec:36 Twp: 6S 96WFootage: 2160 FSL  802 FWL
Log Types:CBL; RMTE; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1122 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1122 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7092 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 853, Top: 2300 ft., Bottom: 7092 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2005 ft.NN
MESAVERDE3903 ft.NN
CAMEO6461 ft.NN
ROLLINS6963 ft.NN

Formation WFCM                     Formation Classification:  DSPW                     Status:  IJ - 9/1/2025                  Interval Top: 3923 ft.    Interval Bottom: 4822 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/21/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2017Treatment End Date:10/6/2017
Treatment Summary:Perforations added 10/4/2011 to 10/6/2011. First injection 10/21/2011. (COGCC Comment: Form 7 injected volume does not appear until January 2012.)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/18/2008
Treatment Summary:2029 GALS 7.5% HCL; 782,300# 30/50 SAND; 21,710 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:3884 ft.
Tubing Packer Depth:3877 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1090
CASING_PRESS 799
MCF_GAS 1072
TUBING_PRESS 586
Perforation Data:
Interval Top:3923 ft.# Of Holes:84
Interval Bottom:4822 ft.Hole Size:0.35 in.

Formation WMFK                     Formation Classification:  DSPW                     Status:  CM - 6/1/2017                  Interval Top: 3923 ft.    Interval Bottom: 4822 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/20/2011Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/22/2011
Treatment Summary:2242 Gals 7 1/2% HCL: 1299200# 20/40 Sand, 50234 Bbls Slickwater (Summary)
Tubing Size:2.375 in.Tubing Setting Depth:3874 ft.
Tubing Packer Depth:3884 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:3923 ft.# Of Holes:84
Interval Bottom:4822 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No